Risk concepts extend the [[[DPV]]] risk vocabulary to provide additional vocabularies specific to risk management, assessment, controls, and consequences.
The namespace for terms in risk is https://www.w3id.org/dpv/risk#
The suggested prefix for the namespace is risk
The risk vocabulary and its documentation is available on GitHub.
WARNING This vocabulary will be undergoing major changes based on the necessity to specify risk assessment and risk management concepts and to ensure provided concepts are useful. There may be extensive removal/additions of concepts that changes the structure and semantics of this extension.
Newcomers to the DPV are strongly recommended to first read through the Primer to familiarise themselves with the semantics and concepts of DPV.
Related Links
The peer-reviewed article “Creating A Vocabulary for Data Privacy” presents a historical overview of the DPVCG, and describes the methodology and structure of the DPV along with describing its creation. An open-access version can be accessed here, here, and here.
Contributing: The DPVCG welcomes participation to improve the DPV and associated resources, including expansion or refinement of concepts, requesting information and applications, and addressing open issues. See contributing page for further information.
Term | 3LikelihoodLevels | Prefix | risk |
---|---|---|---|
Label | 3 Likelihood Levels | ||
IRI | https://w3id.org/dpv/risk#3LikelihoodLevels | ||
Type | rdfs:Class, skos:Concept, dpv:Likelihood | ||
Broader/Parent types | dpv:Likelihood | ||
Object of relation | dpv:hasLikelihood | ||
Definition | Scale with 3 Likelihood Levels from High to Low | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-LEVELS in RISK |
Term | 3RiskLevels | Prefix | risk |
---|---|---|---|
Label | 3 Risk Levels | ||
IRI | https://w3id.org/dpv/risk#3RiskLevels | ||
Type | rdfs:Class, skos:Concept, dpv:RiskLevel | ||
Broader/Parent types | dpv:RiskLevel | ||
Object of relation | dpv:hasRiskLevel | ||
Definition | Scale with 3 Risk Levels from High to Low | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-LEVELS in RISK |
Term | 3SeverityLevels | Prefix | risk |
---|---|---|---|
Label | 3 Severity Levels | ||
IRI | https://w3id.org/dpv/risk#3SeverityLevels | ||
Type | rdfs:Class, skos:Concept, dpv:Severity | ||
Broader/Parent types | dpv:Severity | ||
Object of relation | dpv:hasSeverity | ||
Definition | Scale with 3 Severity Levels from High to Low | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-LEVELS in RISK |
Term | 5LikelihoodLevels | Prefix | risk |
---|---|---|---|
Label | 5 Likelihood Levels | ||
IRI | https://w3id.org/dpv/risk#5LikelihoodLevels | ||
Type | rdfs:Class, skos:Concept, dpv:Likelihood | ||
Broader/Parent types | dpv:Likelihood | ||
Object of relation | dpv:hasLikelihood | ||
Definition | Scale with 5 Likelihood Levels from Very High to Very Low | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-LEVELS in RISK |
Term | 5RiskLevels | Prefix | risk |
---|---|---|---|
Label | 5 Risk Levels | ||
IRI | https://w3id.org/dpv/risk#5RiskLevels | ||
Type | rdfs:Class, skos:Concept, dpv:RiskLevel | ||
Broader/Parent types | dpv:RiskLevel | ||
Object of relation | dpv:hasRiskLevel | ||
Definition | Scale with 5 Risk Levels from Very High to Very Low | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-LEVELS in RISK |
Term | 5SeverityLevels | Prefix | risk |
---|---|---|---|
Label | 5 Severity Levels | ||
IRI | https://w3id.org/dpv/risk#5SeverityLevels | ||
Type | rdfs:Class, skos:Concept, dpv:Severity | ||
Broader/Parent types | dpv:Severity | ||
Object of relation | dpv:hasSeverity | ||
Definition | Scale with 5 Severity Levels from Very High to Very Low | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-LEVELS in RISK |
Term | 7LikelihoodLevels | Prefix | risk |
---|---|---|---|
Label | 7 Likelihood Levels | ||
IRI | https://w3id.org/dpv/risk#7LikelihoodLevels | ||
Type | rdfs:Class, skos:Concept, dpv:Likelihood | ||
Broader/Parent types | dpv:Likelihood | ||
Object of relation | dpv:hasLikelihood | ||
Definition | Scale with 7 Likelihood Levels from Extremely High to Extremely Low | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-LEVELS in RISK |
Term | 7RiskLevels | Prefix | risk |
---|---|---|---|
Label | 7 Risk Levels | ||
IRI | https://w3id.org/dpv/risk#7RiskLevels | ||
Type | rdfs:Class, skos:Concept, dpv:RiskLevel | ||
Broader/Parent types | dpv:RiskLevel | ||
Object of relation | dpv:hasRiskLevel | ||
Definition | Scale with 7 Risk Levels from Extremely High to Extremely Low | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-LEVELS in RISK |
Term | 7SeverityLevels | Prefix | risk |
---|---|---|---|
Label | 7 Severity Levels | ||
IRI | https://w3id.org/dpv/risk#7SeverityLevels | ||
Type | rdfs:Class, skos:Concept, dpv:Severity | ||
Broader/Parent types | dpv:Severity | ||
Object of relation | dpv:hasSeverity | ||
Definition | Scale with 7 Severity Levels from Extremely High to Extremely Low | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-LEVELS in RISK |
Term | AbusiveContentUtilisation | Prefix | risk |
---|---|---|---|
Label | Abusive Content Utilisation | ||
IRI | https://w3id.org/dpv/risk#AbusiveContentUtilisation | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Harm → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | ACSC-ISM | Prefix | risk |
---|---|---|---|
Label | ACSC-ISM | ||
IRI | https://w3id.org/dpv/risk#ACSC-ISM | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | The Australian Cyber Security Centre (ACSC) published the Australian Government Information Security Manual (ISM) which adopts the use of a risk management framework that draws from NIST 800-37, and includes six steps: define the system, select security controls, implement security controls, assess security controls, authorise the system and monitor the system | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | ALARA | Prefix | risk |
---|---|---|---|
Label | ALARA | ||
IRI | https://w3id.org/dpv/risk#ALARA | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | As Low as Resonably Achievable (ALARP) - A criteria for deciding significance of risk and means of evaluating tolerability of risk | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | ALARP | Prefix | risk |
---|---|---|---|
Label | ALARP | ||
IRI | https://w3id.org/dpv/risk#ALARP | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | As Low as Resonably Possible (ALARP) - A criteria for deciding significance of risk and means of evaluating tolerability of risk | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | ANSI-ISA-62443-3-2-2020 | Prefix | risk |
---|---|---|---|
Label | ANSI/ISA-62443-3‑2-2020 | ||
IRI | https://w3id.org/dpv/risk#ANSI-ISA-62443-3-2-2020 | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | ANSI/ISA-62443-3-2-2020 standard, entitled ‘Security for industrial automation and control systems, Part 3-2: Security risk assessment for system design’, from the International Society of Automation (ISA), dedicates an entire part to the assessment of security risk for system design targeting Security and IT professionals | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | AttackonPrivateLife | Prefix | risk |
---|---|---|---|
Label | Attack on Private Life | ||
IRI | https://w3id.org/dpv/risk#AttackonPrivateLife | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Harm → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | AuthorisationFailure | Prefix | risk |
---|---|---|---|
Label | Authorisation Failure | ||
IRI | https://w3id.org/dpv/risk#AuthorisationFailure | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISa Trust Services Security Incidents 2021 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | AvoidSource | Prefix | risk |
---|---|---|---|
Label | Avoid Source | ||
IRI | https://w3id.org/dpv/risk#AvoidSource | ||
Type | rdfs:Class, skos:Concept, dpv:RiskMitigationMeasure | ||
Broader/Parent types | risk:ControlRiskSource → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Subject of relation | dpv:mitigatesRisk | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure | ||
Definition | Risk Control that avoids the risk source | ||
Date Created | 2022-08-21 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONTROLS in RISK |
Term | BayesianAnalysis | Prefix | risk |
---|---|---|---|
Label | Bayesian Analysis | ||
IRI | https://w3id.org/dpv/risk#BayesianAnalysis | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | A means of making inference about model parameters using Bayes' theorem which has the capability of incorporating empirical data into prior judgements about probabilities | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | BayesianNetworks | Prefix | risk |
---|---|---|---|
Label | Bayesian Networks | ||
IRI | https://w3id.org/dpv/risk#BayesianNetworks | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | A graphical model of variables and their cause-effect relationships expressed using probabilities | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | Blackmail | Prefix | risk |
---|---|---|---|
Label | Blackmail | ||
IRI | https://w3id.org/dpv/risk#Blackmail | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Harm → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | BowTie | Prefix | risk |
---|---|---|---|
Label | Bow Tie Analysis | ||
IRI | https://w3id.org/dpv/risk#BowTie | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | A diagrammatic way of describing the pathways from sources of risk to outcomes, and of reviewing controls | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | Brainstorming | Prefix | risk |
---|---|---|---|
Label | Brainstorming | ||
IRI | https://w3id.org/dpv/risk#Brainstorming | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Technique used in workshops to encourage imaginative thinking | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | BruteForceAuthorisations | Prefix | risk |
---|---|---|---|
Label | Brute Force Authorisations | ||
IRI | https://w3id.org/dpv/risk#BruteForceAuthorisations | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | BSI-200-2 | Prefix | risk |
---|---|---|---|
Label | BSI Standard 200-2 | ||
IRI | https://w3id.org/dpv/risk#BSI-200-2 | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | The BSI-Standard 200-2 (‘IT-Grundschutz Methodology’) provides a methodology for the management of information security which can be adapted to the requirements of organisations of various types and sizes | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | Businessdisruption | Prefix | risk |
---|---|---|---|
Label | Business disruption | ||
IRI | https://w3id.org/dpv/risk#Businessdisruption | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | BusinessImpact | Prefix | risk |
---|---|---|---|
Label | Business impact | ||
IRI | https://w3id.org/dpv/risk#BusinessImpact | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Methodology for Sectoral Cybersecurity Assessments | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | BusinessImpactAnalysis | Prefix | risk |
---|---|---|---|
Label | Business Impact Analysis | ||
IRI | https://w3id.org/dpv/risk#BusinessImpactAnalysis | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | A process that analyses the consequences of a disruptive incident on the organization which determines the recovery priorities of an organization's products and services and, thereby, the priorities of the activities and resources which deliver them | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | BusinessPerformanceImpairment | Prefix | risk |
---|---|---|---|
Label | Business Performance Impairment | ||
IRI | https://w3id.org/dpv/risk#BusinessPerformanceImpairment | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | CausalMapping | Prefix | risk |
---|---|---|---|
Label | Causal Mapping | ||
IRI | https://w3id.org/dpv/risk#CausalMapping | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | A network diagram representing events, causes and effects and their relationships. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | CauseConsequenceAnalysis | Prefix | risk |
---|---|---|---|
Label | Cause-Consequence Analysis | ||
IRI | https://w3id.org/dpv/risk#CauseConsequenceAnalysis | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | A combination of fault and event tree analysis that allows inclusion of time delays. Both causes and consequences of an initiating event are considered. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | CCRACII | Prefix | risk |
---|---|---|---|
Label | CCRACII | ||
IRI | https://w3id.org/dpv/risk#CCRACII | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | The Guide to Conducting Cybersecurity Risk Assessment for Critical Information Infrastructure (CCRACII) defines commonly used terms such as threat event, vulnerability, likelihood, impact and risk, roles, and responsibilities, in addition to a range for risk levels, ranging from low to very high with different level of risk toleranc | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | ChangeConsequence | Prefix | risk |
---|---|---|---|
Label | Change Consequence | ||
IRI | https://w3id.org/dpv/risk#ChangeConsequence | ||
Type | rdfs:Class, skos:Concept, dpv:RiskMitigationMeasure | ||
Broader/Parent types | risk:ControlConsequence → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Subject of relation | dpv:mitigatesRisk | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure | ||
Definition | Risk Control that changes Consequence | ||
Date Created | 2022-08-25 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONTROLS in RISK |
Term | ChangeImpact | Prefix | risk |
---|---|---|---|
Label | Change Impact | ||
IRI | https://w3id.org/dpv/risk#ChangeImpact | ||
Type | rdfs:Class, skos:Concept, dpv:RiskMitigationMeasure | ||
Broader/Parent types | risk:ControlImpact → risk:ControlConsequence → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Subject of relation | dpv:mitigatesRisk | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure | ||
Definition | Risk Control that changes Impact | ||
Date Created | 2022-08-26 | ||
Date Modified | 2023-07-31 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONTROLS in RISK |
Term | Checklists | Prefix | risk |
---|---|---|---|
Label | Checklists | ||
IRI | https://w3id.org/dpv/risk#Checklists | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | A checklist based on experience or on concepts and models that can be used to help identify risks or controls. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | ChildViolence | Prefix | risk |
---|---|---|---|
Label | Child Violence | ||
IRI | https://w3id.org/dpv/risk#ChildViolence | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Harm → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | Cindynic | Prefix | risk |
---|---|---|---|
Label | Cindynic Approach | ||
IRI | https://w3id.org/dpv/risk#Cindynic | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Considers goals, values, rules, data and models of stakeholders and identifies inconsistencies, ambiguities, omissions and ignorance. These form systemic sources and drivers of risk. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | CitizensImpact | Prefix | risk |
---|---|---|---|
Label | Citizens impact | ||
IRI | https://w3id.org/dpv/risk#CitizensImpact | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Methodology for Sectoral Cybersecurity Assessments | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | Classifications | Prefix | risk |
---|---|---|---|
Label | Classifications | ||
IRI | https://w3id.org/dpv/risk#Classifications | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | A classification list based on experience or on concepts and models that can be used to help identify risks or controls. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | Coercion | Prefix | risk |
---|---|---|---|
Label | Coercion | ||
IRI | https://w3id.org/dpv/risk#Coercion | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Harm → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Threat Taxonomy 2016 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | ComplianceImpact | Prefix | risk |
---|---|---|---|
Label | Compliance impact | ||
IRI | https://w3id.org/dpv/risk#ComplianceImpact | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Methodology for Sectoral Cybersecurity Assessments | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | CompromiseAccount | Prefix | risk |
---|---|---|---|
Label | Compromise Account | ||
IRI | https://w3id.org/dpv/risk#CompromiseAccount | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Harm → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | CompromiseAccountCredentials | Prefix | risk |
---|---|---|---|
Label | Compromise Account Credentials | ||
IRI | https://w3id.org/dpv/risk#CompromiseAccountCredentials | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Harm → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | CompromiseAccountSecurity | Prefix | risk |
---|---|---|---|
Label | Compromise Account Security | ||
IRI | https://w3id.org/dpv/risk#CompromiseAccountSecurity | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:NonMaterialDamage → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | ConfidentialityBreach | Prefix | risk |
---|---|---|---|
Label | Confidentiality Breach | ||
IRI | https://w3id.org/dpv/risk#ConfidentialityBreach | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | ConsequenceForDataSubject | Prefix | risk |
---|---|---|---|
Label | Consequence for Data Subject | ||
IRI | https://w3id.org/dpv/risk#ConsequenceForDataSubject | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence | ||
Date Created | 2022-10-22 | ||
Contributors | Harshvardhan J. Pandit, Georg P. Krog | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | ConsequenceOnDataSecurity | Prefix | risk |
---|---|---|---|
Label | Consequence on Data Security | ||
IRI | https://w3id.org/dpv/risk#ConsequenceOnDataSecurity | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence | ||
Date Created | 2022-10-22 | ||
Contributors | Harshvardhan J. Pandit, Georg P. Krog | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | ControlConsequence | Prefix | risk |
---|---|---|---|
Label | Control Consequence | ||
IRI | https://w3id.org/dpv/risk#ControlConsequence | ||
Type | rdfs:Class, skos:Concept, dpv:RiskMitigationMeasure | ||
Broader/Parent types | dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Subject of relation | dpv:mitigatesRisk | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure | ||
Definition | Risk Mitigation Measure that controls the Consequences | ||
Date Created | 2022-08-24 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONTROLS in RISK |
Term | ControlImpact | Prefix | risk |
---|---|---|---|
Label | Control Impact | ||
IRI | https://w3id.org/dpv/risk#ControlImpact | ||
Type | rdfs:Class, skos:Concept, dpv:RiskMitigationMeasure | ||
Broader/Parent types | risk:ControlConsequence → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Subject of relation | dpv:mitigatesRisk | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure | ||
Definition | Risk Mitigation Measure that controls Impacts | ||
Date Created | 2022-08-24 | ||
Date Modified | 2023-07-31 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONTROLS in RISK |
Term | ControlMonitors | Prefix | risk |
---|---|---|---|
Label | Control Monitors | ||
IRI | https://w3id.org/dpv/risk#ControlMonitors | ||
Type | rdfs:Class, skos:Concept, dpv:RiskMitigationMeasure | ||
Broader/Parent types | dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Subject of relation | dpv:mitigatesRisk | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure | ||
Definition | Risk Mitigation Measure that uses controls to monitor events | ||
Usage Note | Monitoring can be associated with characteristics such as assessing or detecting whether something is active, operational, performant, effective, has potential to materialise, is materialising, or has already materialised. | ||
Date Created | 2022-08-30 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONTROLS in RISK |
Term | ControlRiskSource | Prefix | risk |
---|---|---|---|
Label | Control Risk Source | ||
IRI | https://w3id.org/dpv/risk#ControlRiskSource | ||
Type | rdfs:Class, skos:Concept, dpv:RiskMitigationMeasure | ||
Broader/Parent types | dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Subject of relation | dpv:mitigatesRisk | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure | ||
Definition | Risk Mitigation Measure that controls the Risk Source | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONTROLS in RISK |
Term | CopyrightViolation | Prefix | risk |
---|---|---|---|
Label | Copyright Violation | ||
IRI | https://w3id.org/dpv/risk#CopyrightViolation | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:NonMaterialDamage → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | CORAS | Prefix | risk |
---|---|---|---|
Label | CORAS | ||
IRI | https://w3id.org/dpv/risk#CORAS | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | The CORAS method was developed and is supported by SourceForge. It is a method for conducting the analysis and management of security risk. It provides a customised language for modelling threats and risks as well as detailed guidelines explaining how the language should be used to capture and model relevant information during the various stages of the security analysis | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | CorruptionData | Prefix | risk |
---|---|---|---|
Label | Corruption of Data | ||
IRI | https://w3id.org/dpv/risk#CorruptionData | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | CostAcquisition | Prefix | risk |
---|---|---|---|
Label | Cost of Acquisition | ||
IRI | https://w3id.org/dpv/risk#CostAcquisition | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | CostBackup | Prefix | risk |
---|---|---|---|
Label | Cost of Backup | ||
IRI | https://w3id.org/dpv/risk#CostBackup | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | CostBenefitAnalysis | Prefix | risk |
---|---|---|---|
Label | Cost/benefit Analysis | ||
IRI | https://w3id.org/dpv/risk#CostBenefitAnalysis | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Uses money as a scale for estimating positive and negative, tangible and intangible, consequences of different options. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | CostConfiguration | Prefix | risk |
---|---|---|---|
Label | Cost of Configuration | ||
IRI | https://w3id.org/dpv/risk#CostConfiguration | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | CostInstallation | Prefix | risk |
---|---|---|---|
Label | Cost of Installation | ||
IRI | https://w3id.org/dpv/risk#CostInstallation | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | CostJudicialPenalties | Prefix | risk |
---|---|---|---|
Label | Cost of Judicial Penalties | ||
IRI | https://w3id.org/dpv/risk#CostJudicialPenalties | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | CostJudicialProceedings | Prefix | risk |
---|---|---|---|
Label | Cost of Judicial Proceedings | ||
IRI | https://w3id.org/dpv/risk#CostJudicialProceedings | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | CostOperationInterruption | Prefix | risk |
---|---|---|---|
Label | Cost of Operation Interruption | ||
IRI | https://w3id.org/dpv/risk#CostOperationInterruption | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | CostSuspendedOperations | Prefix | risk |
---|---|---|---|
Label | Cost of Suspended Operations | ||
IRI | https://w3id.org/dpv/risk#CostSuspendedOperations | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | CRAMM | Prefix | risk |
---|---|---|---|
Label | CRAMM | ||
IRI | https://w3id.org/dpv/risk#CRAMM | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | CCTA Risk Assessment and Management Methodology (CRAMM) is a method that an analyst or group of analysts may use to evaluate the security and risk level of an organisation by analysing and combining the diverse knowledge distributed in the local corporate environment | ||
Source | ENISA Risk Management Standards | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | CrossImpactAnalysis | Prefix | risk |
---|---|---|---|
Label | Cross Impact Analysis | ||
IRI | https://w3id.org/dpv/risk#CrossImpactAnalysis | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Evaluates changes in the probability of the occurrence of a given set of events consequent on the actual occurrence of one of them. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | Cryptojacking | Prefix | risk |
---|---|---|---|
Label | Cryptojacking | ||
IRI | https://w3id.org/dpv/risk#Cryptojacking | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Definition | Cryptojacking or hidden cryptomining is a type of cybercrime where a criminal secretly uses a victim’s computing power to generate cryptocurrency | ||
Source | ENISA Threat Landscape 2021 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | CVaR | Prefix | risk |
---|---|---|---|
Label | Conditional Value at Risk (CVaR) | ||
IRI | https://w3id.org/dpv/risk#CVaR | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | A measure of the expected loss from a financial portfolio in the worst a % of cases. Also called expected shortfall (ES) | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | CyberSpying | Prefix | risk |
---|---|---|---|
Label | Cyber Spying | ||
IRI | https://w3id.org/dpv/risk#CyberSpying | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:NonMaterialDamage → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | CyberStalking | Prefix | risk |
---|---|---|---|
Label | Cyber Stalking | ||
IRI | https://w3id.org/dpv/risk#CyberStalking | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:NonMaterialDamage → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | DamageByThirdParty | Prefix | risk |
---|---|---|---|
Label | Damage by Third Party | ||
IRI | https://w3id.org/dpv/risk#DamageByThirdParty | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Threat Taxonomy 2016 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | DangertoCustomers | Prefix | risk |
---|---|---|---|
Label | Danger to Customers | ||
IRI | https://w3id.org/dpv/risk#DangertoCustomers | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Harm → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | DangertoPersonnel | Prefix | risk |
---|---|---|---|
Label | Danger to Personnel | ||
IRI | https://w3id.org/dpv/risk#DangertoPersonnel | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Harm → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | DataBreach | Prefix | risk |
---|---|---|---|
Label | Data Breach | ||
IRI | https://w3id.org/dpv/risk#DataBreach | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | DecisionTreeAnalysis | Prefix | risk |
---|---|---|---|
Label | Decision Tree Analysis | ||
IRI | https://w3id.org/dpv/risk#DecisionTreeAnalysis | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Uses a tree-like representation or model of decisions and their possible consequences. Outcomes are usually expressed in monetary terms or in terms of utility. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | DelphiTechnique | Prefix | risk |
---|---|---|---|
Label | Delphi Technique | ||
IRI | https://w3id.org/dpv/risk#DelphiTechnique | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Collects judgements through a set of sequential questionnaires. People participate individually but receive feedback on the responses of others after each set of questions. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | DenialServiceAttack | Prefix | risk |
---|---|---|---|
Label | Denial of Service Attack (DoS) | ||
IRI | https://w3id.org/dpv/risk#DenialServiceAttack | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | DetrimentToRecovery | Prefix | risk |
---|---|---|---|
Label | Detriment to Recovery | ||
IRI | https://w3id.org/dpv/risk#DetrimentToRecovery | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Threat Taxonomy 2016 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | Discrimination | Prefix | risk |
---|---|---|---|
Label | Discrimination | ||
IRI | https://w3id.org/dpv/risk#Discrimination | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Harm → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Date Created | 2022-08-19 | ||
Contributors | Georg P. Krog | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | DistributedDenialServiceAttack | Prefix | risk |
---|---|---|---|
Label | Distributed Denial of Service Attack (DDoS) | ||
IRI | https://w3id.org/dpv/risk#DistributedDenialServiceAttack | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | DPIA | Prefix | risk |
---|---|---|---|
Label | Data Protection Impact Assessment (DPIA) | ||
IRI | https://w3id.org/dpv/risk#DPIA | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Analyses how incidents and events could affect the protection of data and its effects on persons and identifies and quantifies the capabilities that would be needed to manage it. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | Eavesdropping | Prefix | risk |
---|---|---|---|
Label | Eavesdropping | ||
IRI | https://w3id.org/dpv/risk#Eavesdropping | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:NonMaterialDamage → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | EBIOS | Prefix | risk |
---|---|---|---|
Label | EBIOS | ||
IRI | https://w3id.org/dpv/risk#EBIOS | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | Expression des Besoins et Identification des Objectifs de Sécurité (EBIOS) Risk Manager is an information security risk management method, created under the French General Secretariat of National Defence, consistent with ISO 31000 and ISO/IEC 27005, and enables the risk management requirements of ISO/IEC 27001 to be met | ||
Source | ENISA Risk Management Standards | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | EconomicDisadvantage | Prefix | risk |
---|---|---|---|
Label | Economic Disadvantage | ||
IRI | https://w3id.org/dpv/risk#EconomicDisadvantage | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Date Created | 2022-08-19 | ||
Contributors | Georg P. Krog | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | EnvironmentalSafetyEndangerment | Prefix | risk |
---|---|---|---|
Label | Environmental Safety Endangerment | ||
IRI | https://w3id.org/dpv/risk#EnvironmentalSafetyEndangerment | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Harm → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | EquipmentFailure | Prefix | risk |
---|---|---|---|
Label | Equipment Failure | ||
IRI | https://w3id.org/dpv/risk#EquipmentFailure | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | EquipmentMalfunction | Prefix | risk |
---|---|---|---|
Label | Equipment Malfunction | ||
IRI | https://w3id.org/dpv/risk#EquipmentMalfunction | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | ERM-IF | Prefix | risk |
---|---|---|---|
Label | ERM-IF | ||
IRI | https://w3id.org/dpv/risk#ERM-IF | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | Enterprise Risk Management - Integrated Framework (ERM-IF) defines the essential components of enterprise risk management. It is based on a set of principles and concepts for the enterprise and has as its objective to offer a common language for enterprise risk | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | ErrornousSystemUse | Prefix | risk |
---|---|---|---|
Label | Errornous System Use | ||
IRI | https://w3id.org/dpv/risk#ErrornousSystemUse | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | ETSI-TS-102-165-1 | Prefix | risk |
---|---|---|---|
Label | ETSI TS 102 165-1 | ||
IRI | https://w3id.org/dpv/risk#ETSI-TS-102-165-1 | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | ETSI TS 102 165-1 offers methodology and pro-forma for threat, vulnerability and risk analysis (TVRA). According to ETSI TS 102 165-1, threat vulnerability and risk analysis (TVRA) is used to identify risk to an information system based upon the product of the likelihood of an attack and the impact that such an attack will have on the system | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | EU-ITSRM | Prefix | risk |
---|---|---|---|
Label | ITSRM² | ||
IRI | https://w3id.org/dpv/risk#EU-ITSRM | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | ITSRM² IT Security Risk Management Methodology is a methodology provided by DG DIGIT and the European Commission as part of a set of standards for information security | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | EventTreeAnalysis | Prefix | risk |
---|---|---|---|
Label | Event Tree Analysis | ||
IRI | https://w3id.org/dpv/risk#EventTreeAnalysis | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Models the possible outcomes from a given initiating event and the status of controls thus analysing the frequency or probability of the various possible outcomes. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | Extorsion | Prefix | risk |
---|---|---|---|
Label | Extorsion | ||
IRI | https://w3id.org/dpv/risk#Extorsion | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Harm → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Threat Taxonomy 2016 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | ExtremelyHighLikelihood | Prefix | risk |
---|---|---|---|
Label | Extremely High Likelihood | ||
IRI | https://w3id.org/dpv/risk#ExtremelyHighLikelihood | ||
Type | rdfs:Class, skos:Concept, dpv:Likelihood | ||
Broader/Parent types | risk:7LikelihoodLevels → dpv:Likelihood | ||
Object of relation | dpv:hasLikelihood | ||
Definition | Level where Likelihood is Extremely High | ||
Usage Note | The suggested quantitative value for this concept is 0.99 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-LEVELS in RISK |
Term | ExtremelyHighRisk | Prefix | risk |
---|---|---|---|
Label | Extremely High Risk | ||
IRI | https://w3id.org/dpv/risk#ExtremelyHighRisk | ||
Type | rdfs:Class, skos:Concept, dpv:RiskLevel | ||
Broader/Parent types | risk:7RiskLevels → dpv:RiskLevel | ||
Object of relation | dpv:hasRiskLevel | ||
Definition | Level where Risk is Extremely High | ||
Usage Note | The suggested quantitative value for this concept is 0.99 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-LEVELS in RISK |
Term | ExtremelyHighSeverity | Prefix | risk |
---|---|---|---|
Label | Extremely High Severity | ||
IRI | https://w3id.org/dpv/risk#ExtremelyHighSeverity | ||
Type | rdfs:Class, skos:Concept, dpv:Severity | ||
Broader/Parent types | risk:7SeverityLevels → dpv:Severity | ||
Object of relation | dpv:hasSeverity | ||
Definition | Level where Severity is Extremely High | ||
Usage Note | The suggested quantitative value for this concept is 0.99 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-LEVELS in RISK |
Term | ExtremelyLowLikelihood | Prefix | risk |
---|---|---|---|
Label | Extremely Low Likelihood | ||
IRI | https://w3id.org/dpv/risk#ExtremelyLowLikelihood | ||
Type | rdfs:Class, skos:Concept, dpv:Likelihood | ||
Broader/Parent types | risk:7LikelihoodLevels → dpv:Likelihood | ||
Object of relation | dpv:hasLikelihood | ||
Definition | Level where Likelihood is Extremely Low | ||
Usage Note | The suggested quantitative value for this concept is 0.01 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-LEVELS in RISK |
Term | ExtremelyLowRisk | Prefix | risk |
---|---|---|---|
Label | Extremely Low Risk | ||
IRI | https://w3id.org/dpv/risk#ExtremelyLowRisk | ||
Type | rdfs:Class, skos:Concept, dpv:RiskLevel | ||
Broader/Parent types | risk:7RiskLevels → dpv:RiskLevel | ||
Object of relation | dpv:hasRiskLevel | ||
Definition | Level where Risk is Extremely Low | ||
Usage Note | The suggested quantitative value for this concept is 0.01 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-LEVELS in RISK |
Term | ExtremelyLowSeverity | Prefix | risk |
---|---|---|---|
Label | Extremely Low Severity | ||
IRI | https://w3id.org/dpv/risk#ExtremelyLowSeverity | ||
Type | rdfs:Class, skos:Concept, dpv:Severity | ||
Broader/Parent types | risk:7SeverityLevels → dpv:Severity | ||
Object of relation | dpv:hasSeverity | ||
Definition | Level where Severity is Extremely Low | ||
Usage Note | The suggested quantitative value for this concept is 0.01 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-LEVELS in RISK |
Term | FAIR | Prefix | risk |
---|---|---|---|
Label | FAIR | ||
IRI | https://w3id.org/dpv/risk#FAIR | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | The purpose of the FAIR (Factor Analysis of Information Risk) model is to help organisations understand, analyse, and measure information risk. The model provides an approach to quantify risk and defines the necessary building blocks for implementing effective cyber risk management programmes | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | FAIR-Privacy | Prefix | risk |
---|---|---|---|
Label | FAIR Privacy | ||
IRI | https://w3id.org/dpv/risk#FAIR-Privacy | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | Factors Analysis in Information Risk (FAIR Privacy) is a quantitative privacy risk framework based on FAIR (Factors Analysis in Information Risk) that examines personal privacy risks (to individuals), not organisational risks | ||
Source | ENISA Risk Management Standards | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | FaultTreeAnalysis | Prefix | risk |
---|---|---|---|
Label | Fault Tree Analysis | ||
IRI | https://w3id.org/dpv/risk#FaultTreeAnalysis | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Analyses causes of a focus event using Boolean logic to describe combinations of faults. Variations include a success tree where the top event is desired and a cause tree used to investigate past events. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | FinancialEquipmentCosts | Prefix | risk |
---|---|---|---|
Label | Financial Equipment Costs | ||
IRI | https://w3id.org/dpv/risk#FinancialEquipmentCosts | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | FinancialInvestigationCosts | Prefix | risk |
---|---|---|---|
Label | Financial Investigation Costs | ||
IRI | https://w3id.org/dpv/risk#FinancialInvestigationCosts | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | FinancialLoss | Prefix | risk |
---|---|---|---|
Label | Financial Loss | ||
IRI | https://w3id.org/dpv/risk#FinancialLoss | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | FinancialPersonnelCosts | Prefix | risk |
---|---|---|---|
Label | Financial Personnel Costs | ||
IRI | https://w3id.org/dpv/risk#FinancialPersonnelCosts | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | FinancialRepairCosts | Prefix | risk |
---|---|---|---|
Label | Financial Repair Costs | ||
IRI | https://w3id.org/dpv/risk#FinancialRepairCosts | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | Fishbone | Prefix | risk |
---|---|---|---|
Label | Ishikawa (Fishbone) | ||
IRI | https://w3id.org/dpv/risk#Fishbone | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Identifies contributory factors to a defined outcome (wanted or unwanted). Contributory factors are usually divided into predefined categories and displayed in a tree structure or a fishbone diagram. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | FMEA | Prefix | risk |
---|---|---|---|
Label | Failure Modes And Effects Analysis (FMEA) | ||
IRI | https://w3id.org/dpv/risk#FMEA | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Considers the ways in which each component of a system might fail and the failure causes and effects. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | FMECA | Prefix | risk |
---|---|---|---|
Label | Failure Modes And Effects And Criticality Analysis (FMECA) | ||
IRI | https://w3id.org/dpv/risk#FMECA | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Considers the ways in which each component of a system might fail and the failure causes and effects. FMEA followed by a criticality analysis which defines the significance of each failure mode (FMECA). | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | FNDiagrams | Prefix | risk |
---|---|---|---|
Label | F-N Diagrams | ||
IRI | https://w3id.org/dpv/risk#FNDiagrams | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Special case of quantitative consequence/likelihood graph applied to consideration of tolerability of risk to human life. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | Fraud | Prefix | risk |
---|---|---|---|
Label | Fraud | ||
IRI | https://w3id.org/dpv/risk#Fraud | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Harm → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | GameTheory | Prefix | risk |
---|---|---|---|
Label | Game Theory | ||
IRI | https://w3id.org/dpv/risk#GameTheory | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | The study of strategic decision making to model the impact of the decisions of different players involved in the game. Example application area can be risk based pricing. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | GCSOS | Prefix | risk |
---|---|---|---|
Label | GCSOS | ||
IRI | https://w3id.org/dpv/risk#GCSOS | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | The Guidelines on Cyber Security Onboard Ships (GCSOS) guidelines explain why and how cyber risks should be managed in a shipping context. They outline the risk assessment process with an explanation of the part played by each component of cyber risk and offer advice on how to respond to and recover from cyber incidents | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | GovernmentCrisis | Prefix | risk |
---|---|---|---|
Label | Government Crisis | ||
IRI | https://w3id.org/dpv/risk#GovernmentCrisis | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | HACCP | Prefix | risk |
---|---|---|---|
Label | Hazard Analysis And Critical Control Points (HACCP) | ||
IRI | https://w3id.org/dpv/risk#HACCP | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Analyses the risk reduction that can be achieved by various layers of protection. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | HaltSource | Prefix | risk |
---|---|---|---|
Label | Halt Source | ||
IRI | https://w3id.org/dpv/risk#HaltSource | ||
Type | rdfs:Class, skos:Concept, dpv:RiskMitigationMeasure | ||
Broader/Parent types | risk:ControlRiskSource → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Subject of relation | dpv:mitigatesRisk | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure | ||
Definition | Risk Control that halts the risk source or prevents it from materialising | ||
Date Created | 2022-08-19 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONTROLS in RISK |
Term | HarmfulSpeech | Prefix | risk |
---|---|---|---|
Label | Harmful Spech | ||
IRI | https://w3id.org/dpv/risk#HarmfulSpeech | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Harm → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | HAZOP | Prefix | risk |
---|---|---|---|
Label | Hazard And Operability Studies (HAZOP) | ||
IRI | https://w3id.org/dpv/risk#HAZOP | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | A structured and systematic examination of a planned or existing process or operation in order to identify and evaluate problems that might represent risk to personnel or equipment, or prevent efficient operation | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | HealthLifeImpact | Prefix | risk |
---|---|---|---|
Label | Health and life impact | ||
IRI | https://w3id.org/dpv/risk#HealthLifeImpact | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Methodology for Sectoral Cybersecurity Assessments | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | HighLikelihood | Prefix | risk |
---|---|---|---|
Label | High Likelihood | ||
IRI | https://w3id.org/dpv/risk#HighLikelihood | ||
Type | rdfs:Class, skos:Concept, dpv:Likelihood | ||
Broader/Parent types | risk:3LikelihoodLevels → dpv:Likelihood | ||
Broader/Parent types | risk:5LikelihoodLevels → dpv:Likelihood | ||
Broader/Parent types | risk:7LikelihoodLevels → dpv:Likelihood | ||
Object of relation | dpv:hasLikelihood | ||
Definition | Level where Likelihood is High | ||
Usage Note | The suggested quantitative value for this concept is 0.75 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-LEVELS in RISK |
Term | HighRisk | Prefix | risk |
---|---|---|---|
Label | High Risk | ||
IRI | https://w3id.org/dpv/risk#HighRisk | ||
Type | rdfs:Class, skos:Concept, dpv:RiskLevel | ||
Broader/Parent types | risk:3RiskLevels → dpv:RiskLevel | ||
Broader/Parent types | risk:5RiskLevels → dpv:RiskLevel | ||
Broader/Parent types | risk:7RiskLevels → dpv:RiskLevel | ||
Object of relation | dpv:hasRiskLevel | ||
Definition | Level where Risk is High | ||
Usage Note | The suggested quantitative value for this concept is 0.75 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-LEVELS in RISK |
Term | HighSeverity | Prefix | risk |
---|---|---|---|
Label | High Severity | ||
IRI | https://w3id.org/dpv/risk#HighSeverity | ||
Type | rdfs:Class, skos:Concept, dpv:Severity | ||
Broader/Parent types | risk:3SeverityLevels → dpv:Severity | ||
Broader/Parent types | risk:5SeverityLevels → dpv:Severity | ||
Broader/Parent types | risk:7SeverityLevels → dpv:Severity | ||
Object of relation | dpv:hasSeverity | ||
Definition | Level where Severity is High | ||
Usage Note | The suggested quantitative value for this concept is 0.75 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-LEVELS in RISK |
Term | HITRUST-CSF | Prefix | risk |
---|---|---|---|
Label | HITRUST-CSF | ||
IRI | https://w3id.org/dpv/risk#HITRUST-CSF | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | The HITRUST Cyber-Security Framework (CSF) is a framework created by security industry experts to safeguard sensitive information and manage information risk for organisations across all industries and throughout the third-party supply chain | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | HumanErrors | Prefix | risk |
---|---|---|---|
Label | Human Errors | ||
IRI | https://w3id.org/dpv/risk#HumanErrors | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | HumanReliabilityAnalysis | Prefix | risk |
---|---|---|---|
Label | Human Reliability Analysis | ||
IRI | https://w3id.org/dpv/risk#HumanReliabilityAnalysis | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | A set of techniques for identifying the potential for human error and estimating the likelihood of failure. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | IdentityDispute | Prefix | risk |
---|---|---|---|
Label | Identity Dispute | ||
IRI | https://w3id.org/dpv/risk#IdentityDispute | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Date Created | 2022-08-24 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | IdentityFraud | Prefix | risk |
---|---|---|---|
Label | Identity Fraud | ||
IRI | https://w3id.org/dpv/risk#IdentityFraud | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Harm → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Threat Taxonomy 2016 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | IdentityTheft | Prefix | risk |
---|---|---|---|
Label | Identity Theft | ||
IRI | https://w3id.org/dpv/risk#IdentityTheft | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Harm → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Threat Taxonomy 2016 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | IllegalProcessingData | Prefix | risk |
---|---|---|---|
Label | Illegal Processing of Data | ||
IRI | https://w3id.org/dpv/risk#IllegalProcessingData | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | IMO-MSC-FAL1-CIRC3 | Prefix | risk |
---|---|---|---|
Label | IMO MSC-FAL.1/CIRC.3 | ||
IRI | https://w3id.org/dpv/risk#IMO-MSC-FAL1-CIRC3 | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | The official International Maritime Organization guidelines IMO MSC-FAL.1/CIRC.3 provide a high-level approach to the management pf maritime cyber risk which refers to the extent a technology asset is exposed to risks during an event that could result in shipping-related operational failure | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | ImpactOnDataSubject | Prefix | risk |
---|---|---|---|
Label | Impact on Data Subject | ||
IRI | https://w3id.org/dpv/risk#ImpactOnDataSubject | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Date Created | 2022-10-22 | ||
Contributors | Harshvardhan J. Pandit, Georg P. Krog | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | ImpacttoRights | Prefix | risk |
---|---|---|---|
Label | Impact to Rights | ||
IRI | https://w3id.org/dpv/risk#ImpacttoRights | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | IncreaseInternalCost | Prefix | risk |
---|---|---|---|
Label | Increase Internal Cost | ||
IRI | https://w3id.org/dpv/risk#IncreaseInternalCost | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | IndustrialCrisis | Prefix | risk |
---|---|---|---|
Label | Industrial Crisis | ||
IRI | https://w3id.org/dpv/risk#IndustrialCrisis | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | InfluenceDiagrams | Prefix | risk |
---|---|---|---|
Label | Influence Diagrams | ||
IRI | https://w3id.org/dpv/risk#InfluenceDiagrams | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | An extended version of Bayesian networks that includes variables representing uncertainties, consequences and actions | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | Injury | Prefix | risk |
---|---|---|---|
Label | Injury | ||
IRI | https://w3id.org/dpv/risk#Injury | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Harm → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | InterceptionCommunications | Prefix | risk |
---|---|---|---|
Label | Interception of Communications | ||
IRI | https://w3id.org/dpv/risk#InterceptionCommunications | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | InternalOperationDisruption | Prefix | risk |
---|---|---|---|
Label | Internal Operation Disruption | ||
IRI | https://w3id.org/dpv/risk#InternalOperationDisruption | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | Interviews | Prefix | risk |
---|---|---|---|
Label | Interviews | ||
IRI | https://w3id.org/dpv/risk#Interviews | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Structured or semi- structured one-to-one conversations to elicit views. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | IRAM2 | Prefix | risk |
---|---|---|---|
Label | IRAM2 | ||
IRI | https://w3id.org/dpv/risk#IRAM2 | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | Information Risk Assessment Methodology (IRAM2) supports risk assessment and treatment and entails a six-phase process, and is is implemented by an automated toolset | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | IS-BM | Prefix | risk |
---|---|---|---|
Label | IS-BM | ||
IRI | https://w3id.org/dpv/risk#IS-BM | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | The IS risk analysis method is based on a business model using a quantitative approach. The values of IS assets come from their importance towards operational continuity, as well as from their replacement costs | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | ISACA-RISK-IT | Prefix | risk |
---|---|---|---|
Label | ISACA-RISK-IT | ||
IRI | https://w3id.org/dpv/risk#ISACA-RISK-IT | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | The ISACA Risk IT Framework provides a set of guiding principles and supporting practices for enterprise management, combined to deliver a comprehensive process model for governing and managing IT risk | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | ISAMM | Prefix | risk |
---|---|---|---|
Label | ISAMM | ||
IRI | https://w3id.org/dpv/risk#ISAMM | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | Information Security Assessment and Monitoring Method (ISAMM) is a quantitative type of risk management methodology that can be applied by various organisations such as governmental agencies, large companies and small and medium size enterprises | ||
Source | ENISA Risk Management Standards | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | ISO-IEC-27005-2018 | Prefix | risk |
---|---|---|---|
Label | ISO/IEC 27005:2018 | ||
IRI | https://w3id.org/dpv/risk#ISO-IEC-27005-2018 | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | ISO/IEC 27005:2018 ‘Information technology — Security techniques — Information security risk management’ is a risk management framework applicable to all types of organisations (e.g. commercial enterprises, government agencies, non-profit organisations) which intend to manage risks that could compromise the organisation’s information security | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | ISRAM | Prefix | risk |
---|---|---|---|
Label | ISRAM | ||
IRI | https://w3id.org/dpv/risk#ISRAM | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | ISRAM is a quantitative, paper-based risk analysis method that is designed to allow effective participation of managers and staff in the process | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | IT-Grundschutz | Prefix | risk |
---|---|---|---|
Label | IT-Grundschutz | ||
IRI | https://w3id.org/dpv/risk#IT-Grundschutz | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | IT-Grundschutz has been developed by the Federal Office for Information Security in Germany. IT-Grundschutz provides a configuration for the establishment of an integrated and effective IT security managemen | ||
Source | ENISA Risk Management Standards | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | KnownVulnerabilityExploited | Prefix | risk |
---|---|---|---|
Label | Known Vulnerability Exploited | ||
IRI | https://w3id.org/dpv/risk#KnownVulnerabilityExploited | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | LawEnforcementAdverseEffects | Prefix | risk |
---|---|---|---|
Label | Law Enforcement Adverse Effects | ||
IRI | https://w3id.org/dpv/risk#LawEnforcementAdverseEffects | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | LimitationOfRights | Prefix | risk |
---|---|---|---|
Label | Limitation of Rights | ||
IRI | https://w3id.org/dpv/risk#LimitationOfRights | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Harm → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Date Created | 2022-08-18 | ||
Contributors | Georg P. Krog, Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | LOPA | Prefix | risk |
---|---|---|---|
Label | Layer Protection Analysis (LOPA) | ||
IRI | https://w3id.org/dpv/risk#LOPA | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Analyses the risk reduction that can be achieved by various layers of protection. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | LossAssets | Prefix | risk |
---|---|---|---|
Label | Loss of Assets | ||
IRI | https://w3id.org/dpv/risk#LossAssets | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:MaterialDamage → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | LossCompetitiveAdvantage | Prefix | risk |
---|---|---|---|
Label | Loss of Competitive Advantage | ||
IRI | https://w3id.org/dpv/risk#LossCompetitiveAdvantage | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:NonMaterialDamage → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | LossControlOverData | Prefix | risk |
---|---|---|---|
Label | Loss of Control over Data | ||
IRI | https://w3id.org/dpv/risk#LossControlOverData | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:NonMaterialDamage → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Date Created | 2022-08-19 | ||
Contributors | Georg P. Krog, Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | LossCredibility | Prefix | risk |
---|---|---|---|
Label | Loss of Credibility | ||
IRI | https://w3id.org/dpv/risk#LossCredibility | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | LossCustomerConfidence | Prefix | risk |
---|---|---|---|
Label | Loss of Customer Confidence | ||
IRI | https://w3id.org/dpv/risk#LossCustomerConfidence | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | LossCustomers | Prefix | risk |
---|---|---|---|
Label | Loss of Customers | ||
IRI | https://w3id.org/dpv/risk#LossCustomers | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:NonMaterialDamage → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | LossData | Prefix | risk |
---|---|---|---|
Label | Loss of Data | ||
IRI | https://w3id.org/dpv/risk#LossData | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:NonMaterialDamage → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Threat Taxonomy 2016 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | LossFunds | Prefix | risk |
---|---|---|---|
Label | Loss of Funds | ||
IRI | https://w3id.org/dpv/risk#LossFunds | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:MaterialDamage → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | LossGoods | Prefix | risk |
---|---|---|---|
Label | Loss of Goods | ||
IRI | https://w3id.org/dpv/risk#LossGoods | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:MaterialDamage → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | LossGoodwill | Prefix | risk |
---|---|---|---|
Label | Loss of Goodwill | ||
IRI | https://w3id.org/dpv/risk#LossGoodwill | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | LossNegotiatingCapacity | Prefix | risk |
---|---|---|---|
Label | Loss of Negotiating Capacity | ||
IRI | https://w3id.org/dpv/risk#LossNegotiatingCapacity | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | LossOpportunity | Prefix | risk |
---|---|---|---|
Label | Loss of Opportunity | ||
IRI | https://w3id.org/dpv/risk#LossOpportunity | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | LossProprietaryInformation | Prefix | risk |
---|---|---|---|
Label | Loss of Proprietary Information | ||
IRI | https://w3id.org/dpv/risk#LossProprietaryInformation | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:NonMaterialDamage → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | LossReputation | Prefix | risk |
---|---|---|---|
Label | Loss of Reputation | ||
IRI | https://w3id.org/dpv/risk#LossReputation | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | LossResources | Prefix | risk |
---|---|---|---|
Label | Loss of Resources | ||
IRI | https://w3id.org/dpv/risk#LossResources | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:NonMaterialDamage → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Threat Taxonomy 2016 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | LossSuppliers | Prefix | risk |
---|---|---|---|
Label | Loss of Suppliers | ||
IRI | https://w3id.org/dpv/risk#LossSuppliers | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:NonMaterialDamage → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | LossTechnologicalAdvantage | Prefix | risk |
---|---|---|---|
Label | Loss of Technological Advantage | ||
IRI | https://w3id.org/dpv/risk#LossTechnologicalAdvantage | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:NonMaterialDamage → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | LossTrust | Prefix | risk |
---|---|---|---|
Label | Loss of Trust | ||
IRI | https://w3id.org/dpv/risk#LossTrust | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | LowLikelihood | Prefix | risk |
---|---|---|---|
Label | Low Likelihood | ||
IRI | https://w3id.org/dpv/risk#LowLikelihood | ||
Type | rdfs:Class, skos:Concept, dpv:Likelihood | ||
Broader/Parent types | risk:3LikelihoodLevels → dpv:Likelihood | ||
Broader/Parent types | risk:5LikelihoodLevels → dpv:Likelihood | ||
Broader/Parent types | risk:7LikelihoodLevels → dpv:Likelihood | ||
Object of relation | dpv:hasLikelihood | ||
Definition | Level where Likelihood is Low | ||
Usage Note | The suggested quantitative value for this concept is 0.25 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-LEVELS in RISK |
Term | LowRisk | Prefix | risk |
---|---|---|---|
Label | Low Risk | ||
IRI | https://w3id.org/dpv/risk#LowRisk | ||
Type | rdfs:Class, skos:Concept, dpv:RiskLevel | ||
Broader/Parent types | risk:3RiskLevels → dpv:RiskLevel | ||
Broader/Parent types | risk:5RiskLevels → dpv:RiskLevel | ||
Broader/Parent types | risk:7RiskLevels → dpv:RiskLevel | ||
Object of relation | dpv:hasRiskLevel | ||
Definition | Level where Risk is Low | ||
Usage Note | The suggested quantitative value for this concept is 0.25 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-LEVELS in RISK |
Term | LowSeverity | Prefix | risk |
---|---|---|---|
Label | Low Severity | ||
IRI | https://w3id.org/dpv/risk#LowSeverity | ||
Type | rdfs:Class, skos:Concept, dpv:Severity | ||
Broader/Parent types | risk:3SeverityLevels → dpv:Severity | ||
Broader/Parent types | risk:5SeverityLevels → dpv:Severity | ||
Broader/Parent types | risk:7SeverityLevels → dpv:Severity | ||
Object of relation | dpv:hasSeverity | ||
Definition | Level where Severity is Low | ||
Usage Note | The suggested quantitative value for this concept is 0.25 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-LEVELS in RISK |
Term | MAGERIT | Prefix | risk |
---|---|---|---|
Label | MAGERIT | ||
IRI | https://w3id.org/dpv/risk#MAGERIT | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | Method for the Harmonised Analysis of Risk (MAGERIT) is an open methodology for risk analysis and management developed by the Spanish Higher Council for Electronic Government and offered as a framework and guide to the public administration | ||
Source | ENISA Risk Management Standards | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | MaliciousCodeAttack | Prefix | risk |
---|---|---|---|
Label | Malicious Code Attack | ||
IRI | https://w3id.org/dpv/risk#MaliciousCodeAttack | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Definition | Intentional use of software by including or inserting in a system for a harmful purpose | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | MalwareAttack | Prefix | risk |
---|---|---|---|
Label | Malware Attack | ||
IRI | https://w3id.org/dpv/risk#MalwareAttack | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Definition | Malware is software or firmware intended to perform an unauthorised process that will have an adverse impact on the confidentiality, integrity, or availability of a system | ||
Source | ENISA Methodology for Sectoral Cybersecurity Assessments | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | MarkovAnalysis | Prefix | risk |
---|---|---|---|
Label | Markov Analysis | ||
IRI | https://w3id.org/dpv/risk#MarkovAnalysis | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Calculates the probability that a system that has the capacity to be in one of a number of states will be in a particular state at a time t in the future. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | MCA | Prefix | risk |
---|---|---|---|
Label | Multi-criteria Analysis (MCA) | ||
IRI | https://w3id.org/dpv/risk#MCA | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Compares options in a way that makes trade-offs explicit. Provides an alternative to cost/benefit analysis that does not need a monetary value to be allocated to all inputs. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | MEHARI | Prefix | risk |
---|---|---|---|
Label | MEHARI | ||
IRI | https://w3id.org/dpv/risk#MEHARI | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | MEHARI is a free of charge qualitative risk analysis and management method developed by CLUSIF (Club for the Security of Information in France/Club de la Sécurité de l'Information Français) | ||
Source | ENISA Risk Management Standards | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | MisinformationDisinformation | Prefix | risk |
---|---|---|---|
Label | MisinformationDisinformation | ||
IRI | https://w3id.org/dpv/risk#MisinformationDisinformation | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Definition | Information that is untrue, misleading, or false and used intentionally (disinformation) or unintentionally (misinformation) | ||
Source | ENISA Threat Landscape 2021 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | MisuseBreachedInformation | Prefix | risk |
---|---|---|---|
Label | Misuse of Breached Information | ||
IRI | https://w3id.org/dpv/risk#MisuseBreachedInformation | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | ModerateLikelihood | Prefix | risk |
---|---|---|---|
Label | Moderate Likelihood | ||
IRI | https://w3id.org/dpv/risk#ModerateLikelihood | ||
Type | rdfs:Class, skos:Concept, dpv:Likelihood | ||
Broader/Parent types | risk:3LikelihoodLevels → dpv:Likelihood | ||
Broader/Parent types | risk:5LikelihoodLevels → dpv:Likelihood | ||
Broader/Parent types | risk:7LikelihoodLevels → dpv:Likelihood | ||
Object of relation | dpv:hasLikelihood | ||
Definition | Level where Likelihood is Moderate | ||
Usage Note | The suggested quantitative value for this concept is 0.5 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-LEVELS in RISK |
Term | ModerateRisk | Prefix | risk |
---|---|---|---|
Label | Moderate Risk | ||
IRI | https://w3id.org/dpv/risk#ModerateRisk | ||
Type | rdfs:Class, skos:Concept, dpv:RiskLevel | ||
Broader/Parent types | risk:3RiskLevels → dpv:RiskLevel | ||
Broader/Parent types | risk:5RiskLevels → dpv:RiskLevel | ||
Broader/Parent types | risk:7RiskLevels → dpv:RiskLevel | ||
Object of relation | dpv:hasRiskLevel | ||
Definition | Level where Risk is Moderate | ||
Usage Note | The suggested quantitative value for this concept is 0.5 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-LEVELS in RISK |
Term | ModerateSeverity | Prefix | risk |
---|---|---|---|
Label | Moderate Severity | ||
IRI | https://w3id.org/dpv/risk#ModerateSeverity | ||
Type | rdfs:Class, skos:Concept, dpv:Severity | ||
Broader/Parent types | risk:3SeverityLevels → dpv:Severity | ||
Broader/Parent types | risk:5SeverityLevels → dpv:Severity | ||
Broader/Parent types | risk:7SeverityLevels → dpv:Severity | ||
Object of relation | dpv:hasSeverity | ||
Definition | Level where Severity is Moderate | ||
Usage Note | The suggested quantitative value for this concept is 0.5 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-LEVELS in RISK |
Term | MONARC | Prefix | risk |
---|---|---|---|
Label | MONARC | ||
IRI | https://w3id.org/dpv/risk#MONARC | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | MONARC (Méthode Optimisée d’analyse des risques CASES – ‘Method for an Optimised Analysis of Risks by CASES’ is a tool and a method allowing precise and repeatable risk assessments to take place | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | MonitorConsequence | Prefix | risk |
---|---|---|---|
Label | Monitor Consequence | ||
IRI | https://w3id.org/dpv/risk#MonitorConsequence | ||
Type | rdfs:Class, skos:Concept, dpv:RiskMitigationMeasure | ||
Broader/Parent types | risk:ControlMonitors → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Subject of relation | dpv:mitigatesRisk | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure | ||
Definition | Risk Control that monitors a Risk Consequence | ||
Date Created | 2022-09-03 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONTROLS in RISK |
Term | MonitorImpact | Prefix | risk |
---|---|---|---|
Label | Monitor Impact | ||
IRI | https://w3id.org/dpv/risk#MonitorImpact | ||
Type | rdfs:Class, skos:Concept, dpv:RiskMitigationMeasure | ||
Broader/Parent types | risk:ControlMonitors → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Subject of relation | dpv:mitigatesRisk | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure | ||
Definition | Risk Control that monitors a Risk Impact | ||
Date Created | 2022-09-04 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONTROLS in RISK |
Term | MonitorRisk | Prefix | risk |
---|---|---|---|
Label | Monitor Risk | ||
IRI | https://w3id.org/dpv/risk#MonitorRisk | ||
Type | rdfs:Class, skos:Concept, dpv:RiskMitigationMeasure | ||
Broader/Parent types | risk:ControlMonitors → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Subject of relation | dpv:mitigatesRisk | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure | ||
Definition | Risk Control that monitors a Risk | ||
Date Created | 2022-08-31 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONTROLS in RISK |
Term | MonitorRiskControl | Prefix | risk |
---|---|---|---|
Label | Monitor Risk Control | ||
IRI | https://w3id.org/dpv/risk#MonitorRiskControl | ||
Type | rdfs:Class, skos:Concept, dpv:RiskMitigationMeasure | ||
Broader/Parent types | risk:ControlMonitors → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Subject of relation | dpv:mitigatesRisk | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure | ||
Definition | Risk Control that monitors another Risk Control | ||
Date Created | 2022-09-05 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONTROLS in RISK |
Term | MonitorRiskSource | Prefix | risk |
---|---|---|---|
Label | Monitor Risk Source | ||
IRI | https://w3id.org/dpv/risk#MonitorRiskSource | ||
Type | rdfs:Class, skos:Concept, dpv:RiskMitigationMeasure | ||
Broader/Parent types | risk:ControlMonitors → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Subject of relation | dpv:mitigatesRisk | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure | ||
Definition | Risk Control that monitors a Risk Source | ||
Date Created | 2022-09-01 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONTROLS in RISK |
Term | MonitorVulnerabilities | Prefix | risk |
---|---|---|---|
Label | Monitor Vulnerabilities | ||
IRI | https://w3id.org/dpv/risk#MonitorVulnerabilities | ||
Type | rdfs:Class, skos:Concept, dpv:RiskMitigationMeasure | ||
Broader/Parent types | risk:ControlMonitors → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Subject of relation | dpv:mitigatesRisk | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure | ||
Definition | Risk Control that monitors a Risk Vulnerability | ||
Date Created | 2022-09-02 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONTROLS in RISK |
Term | MonteCarloSimulation | Prefix | risk |
---|---|---|---|
Label | Monte Carlo Simulation | ||
IRI | https://w3id.org/dpv/risk#MonteCarloSimulation | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Calculates the probability of outcomes by running multiple simulations using random variables. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | NIST-SP-800-30 | Prefix | risk |
---|---|---|---|
Label | NIST SP 800-30 | ||
IRI | https://w3id.org/dpv/risk#NIST-SP-800-30 | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | NIST 800-30 is a free guide that provides a foundation for the development of an effective risk management programme, containing both the definitions and the practical guidance necessary for assessing and mitigating risks identified within IT systems | ||
Source | ENISA Risk Management Standards | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | NIST-SP-800-37 | Prefix | risk |
---|---|---|---|
Label | NIST SP 800-37 | ||
IRI | https://w3id.org/dpv/risk#NIST-SP-800-37 | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | NIST SP 800-37 Rev. 2 is an asset-based RMF which comprises 7 steps, namely Prepare, Categorise, Select, Implement, Assess, Authorise and Monitor. It does not adopt a specific risk assessment methodology, although the NIST 800-30 guide is extensively referenced | ||
Source | ENISA Risk Management Standards | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | NIST-SP-800-39 | Prefix | risk |
---|---|---|---|
Label | NIST SP 800–39 | ||
IRI | https://w3id.org/dpv/risk#NIST-SP-800-39 | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | The purpose of NIST SP 800-39 is to provide a structured, yet flexible approach for an integrated, enterprise-wide programme for managing the risk to information security of organisational operations (i.e. mission, functions, image, and reputation) and assets, individuals, other organisations etc. on an ongoing basis | ||
Source | ENISA Risk Management Standards | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | NIST-SP-800-82 | Prefix | risk |
---|---|---|---|
Label | NIST SP 800–82 | ||
IRI | https://w3id.org/dpv/risk#NIST-SP-800-82 | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | NIST SP 800-82 Rev. 2 (Stouffer, et al., 2015), entitled ‘Guide to industrial control systems (ISC) security’, is an Industrial Control Systems Security Guide | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | NominalGroupTechnique | Prefix | risk |
---|---|---|---|
Label | Nominal Group Technique | ||
IRI | https://w3id.org/dpv/risk#NominalGroupTechnique | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Technique for eliciting views from a group of people where initial participation is as individuals with no interaction, then group discussion of ideas follows. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | O-RA | Prefix | risk |
---|---|---|---|
Label | O-RA | ||
IRI | https://w3id.org/dpv/risk#O-RA | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | The Open Group Standard for Risk Analysis (O-RA) provides a set of standards for various aspects of information security risk analysis that is based on the Open FAIR framework and can be applied to any risk scenario | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | OCTAVE | Prefix | risk |
---|---|---|---|
Label | OCTAVE | ||
IRI | https://w3id.org/dpv/risk#OCTAVE | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | Operationally Critical Threat, Asset, and Vulnerability Evaluation (OCTAVE) is a free of charge approach to evaluations of information security risk that is comprehensive, systematic, context-driven, and self-directed | ||
Source | ENISA Risk Management Standards | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | OCTAVE-ALLEGRO | Prefix | risk |
---|---|---|---|
Label | OCTAVE ALLEGRO | ||
IRI | https://w3id.org/dpv/risk#OCTAVE-ALLEGRO | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | OCTAVE Allegro is designed to allow broad assessment of an organisation’s operational risk environment, with the goal of producing robust results without the need for extensive knowledge of risk assessment | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | OCTAVE-FORTE | Prefix | risk |
---|---|---|---|
Label | OCTAVE FORTE | ||
IRI | https://w3id.org/dpv/risk#OCTAVE-FORTE | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | The OCTAVE FORTE process model was developed to support organisations in evaluating their security risks. It applies Enterprise Risk Management (ERM) principles to bridge the gap between executives and practitioners acting as decision makers | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | OCTAVE-S | Prefix | risk |
---|---|---|---|
Label | OCTAVE-S | ||
IRI | https://w3id.org/dpv/risk#OCTAVE-S | ||
Type | rdfs:Class, skos:Concept, risk:RiskManagement | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | The OCTAVE-S is based on the OCTAVE approach and is a self-directed approach, meaning that people from an organisation assume responsibility for setting the organisation’s security strategy | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-METHODOLOGY in RISK |
Term | OrganisationDisruption | Prefix | risk |
---|---|---|---|
Label | Organisation Disruption | ||
IRI | https://w3id.org/dpv/risk#OrganisationDisruption | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | ParetoCharts | Prefix | risk |
---|---|---|---|
Label | Pareto Charts | ||
IRI | https://w3id.org/dpv/risk#ParetoCharts | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | The Pareto principle (the 80–20 rule) states that, for many events, roughly 80 % of the effects come from 20 % of the causes. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | PersonalSafetyEndangerment | Prefix | risk |
---|---|---|---|
Label | Personal Safety Endangerment | ||
IRI | https://w3id.org/dpv/risk#PersonalSafetyEndangerment | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Harm → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | PersonnelAbsence | Prefix | risk |
---|---|---|---|
Label | Personnel Absence | ||
IRI | https://w3id.org/dpv/risk#PersonnelAbsence | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:NonMaterialDamage → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Threat Taxonomy 2016 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | PhishingScam | Prefix | risk |
---|---|---|---|
Label | Phishing Scam | ||
IRI | https://w3id.org/dpv/risk#PhishingScam | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Harm → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Definition | A type of social engineering attack involving deceptive messages intended to reveal sensitive information | ||
Source | ENISA Threat Landscape for Ransomware Attacks 2022 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | PhysicalAssault | Prefix | risk |
---|---|---|---|
Label | Physical Assault | ||
IRI | https://w3id.org/dpv/risk#PhysicalAssault | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Harm → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | PhysicalSpying | Prefix | risk |
---|---|---|---|
Label | Physical Spying | ||
IRI | https://w3id.org/dpv/risk#PhysicalSpying | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:NonMaterialDamage → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | PhysicalStalking | Prefix | risk |
---|---|---|---|
Label | Physical Stalking | ||
IRI | https://w3id.org/dpv/risk#PhysicalStalking | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:NonMaterialDamage → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | PIA | Prefix | risk |
---|---|---|---|
Label | Privacy Impact Analysis (PIA) | ||
IRI | https://w3id.org/dpv/risk#PIA | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Analyses how incidents and events could affect a person's privacy and identifies and quantifies the capabilities that would be needed to manage it. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | PreventExercisingOfRights | Prefix | risk |
---|---|---|---|
Label | Prevent Exercising of Rights | ||
IRI | https://w3id.org/dpv/risk#PreventExercisingOfRights | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Harm → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Date Created | 2022-08-18 | ||
Contributors | Georg P. Krog, Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | PrivacyImpact | Prefix | risk |
---|---|---|---|
Label | Privacy impact | ||
IRI | https://w3id.org/dpv/risk#PrivacyImpact | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Methodology for Sectoral Cybersecurity Assessments | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | PsychologicalHarm | Prefix | risk |
---|---|---|---|
Label | Psychological Harm | ||
IRI | https://w3id.org/dpv/risk#PsychologicalHarm | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Harm → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | PublicOrderBreach | Prefix | risk |
---|---|---|---|
Label | Public Order Breach | ||
IRI | https://w3id.org/dpv/risk#PublicOrderBreach | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | QualitativeRiskAnalysis | Prefix | risk |
---|---|---|---|
Label | Qualitative Risk Analysis | ||
IRI | https://w3id.org/dpv/risk#QualitativeRiskAnalysis | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | A risk analysis technique that uses qualitative methods | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | QuantitativeRiskAnalysis | Prefix | risk |
---|---|---|---|
Label | Quantitative Risk Analysis | ||
IRI | https://w3id.org/dpv/risk#QuantitativeRiskAnalysis | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | A risk analysis technique that uses quantitative methods | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | RansomwareAttack | Prefix | risk |
---|---|---|---|
Label | RansomwareAttack | ||
IRI | https://w3id.org/dpv/risk#RansomwareAttack | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:NonMaterialDamage → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Definition | Ransomware is a type of attack where threat actors take control of a target’s assets and demand a ransom in exchange for the return of the asset’s availability and confidentiality | ||
Source | ISO/IEC 27005:2018,ENISA Threat Landscape for Ransomware Attacks 2022 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | ReduceLikelihood | Prefix | risk |
---|---|---|---|
Label | Reduce Likelihood | ||
IRI | https://w3id.org/dpv/risk#ReduceLikelihood | ||
Type | rdfs:Class, skos:Concept, dpv:RiskMitigationMeasure | ||
Broader/Parent types | dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Subject of relation | dpv:mitigatesRisk | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure | ||
Definition | Risk Control that reduces the likelihood of an event | ||
Date Created | 2022-08-22 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONTROLS in RISK |
Term | ReduceSeverity | Prefix | risk |
---|---|---|---|
Label | Reduce Severity | ||
IRI | https://w3id.org/dpv/risk#ReduceSeverity | ||
Type | rdfs:Class, skos:Concept, dpv:RiskMitigationMeasure | ||
Broader/Parent types | dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Subject of relation | dpv:mitigatesRisk | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure | ||
Definition | Risk Control that reduces the severity of an event | ||
Date Created | 2022-08-23 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONTROLS in RISK |
Term | ReliabilityCentredMaintenance | Prefix | risk |
---|---|---|---|
Label | Reliability Centred Maintenance | ||
IRI | https://w3id.org/dpv/risk#ReliabilityCentredMaintenance | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | A risk based assessment used to identify the appropriate maintenance tasks for a system and its components. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | RemoteSpying | Prefix | risk |
---|---|---|---|
Label | Remote Spying | ||
IRI | https://w3id.org/dpv/risk#RemoteSpying | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:NonMaterialDamage → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | RemoveConsequence | Prefix | risk |
---|---|---|---|
Label | Remove Consequence | ||
IRI | https://w3id.org/dpv/risk#RemoveConsequence | ||
Type | rdfs:Class, skos:Concept, dpv:RiskMitigationMeasure | ||
Broader/Parent types | risk:ControlConsequence → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Subject of relation | dpv:mitigatesRisk | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure | ||
Definition | Risk Control that removes Consequence i.e. prevents it from materialising | ||
Date Created | 2022-08-27 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONTROLS in RISK |
Term | RemoveImpact | Prefix | risk |
---|---|---|---|
Label | Remove Impact | ||
IRI | https://w3id.org/dpv/risk#RemoveImpact | ||
Type | rdfs:Class, skos:Concept, dpv:RiskMitigationMeasure | ||
Broader/Parent types | risk:ControlImpact → risk:ControlConsequence → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Subject of relation | dpv:mitigatesRisk | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure | ||
Definition | Risk Control that removes Impact i.e. prevents it from materialising | ||
Date Created | 2022-08-28 | ||
Date Modified | 2023-07-31 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONTROLS in RISK |
Term | RemoveSource | Prefix | risk |
---|---|---|---|
Label | Remove Source | ||
IRI | https://w3id.org/dpv/risk#RemoveSource | ||
Type | rdfs:Class, skos:Concept, dpv:RiskMitigationMeasure | ||
Broader/Parent types | risk:ControlRiskSource → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Subject of relation | dpv:mitigatesRisk | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure | ||
Definition | Risk Control that removes the risk source | ||
Date Created | 2022-08-20 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONTROLS in RISK |
Term | ReplacementCosts | Prefix | risk |
---|---|---|---|
Label | Replacement Costs | ||
IRI | https://w3id.org/dpv/risk#ReplacementCosts | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | ReputationTrustImpact | Prefix | risk |
---|---|---|---|
Label | Reputation and trust impact | ||
IRI | https://w3id.org/dpv/risk#ReputationTrustImpact | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Methodology for Sectoral Cybersecurity Assessments | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | RetrievalDeletedData | Prefix | risk |
---|---|---|---|
Label | Retrieval of Deleted Data | ||
IRI | https://w3id.org/dpv/risk#RetrievalDeletedData | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | RetrievalDiscardedEquipment | Prefix | risk |
---|---|---|---|
Label | Retrieval of Discarded Equipment | ||
IRI | https://w3id.org/dpv/risk#RetrievalDiscardedEquipment | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | RiskAnalysis | Prefix | risk |
---|---|---|---|
Label | RiskAnalysis | ||
IRI | https://w3id.org/dpv/risk#RiskAnalysis | ||
Type | rdfs:Class, skos:Concept | ||
Broader/Parent types | dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | A technique or method used to analyse and identify risk levels, sources, likelihoods, severities, and other necessary information required to conduct risk management procedures | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | RiskIndices | Prefix | risk |
---|---|---|---|
Label | Risk Indices | ||
IRI | https://w3id.org/dpv/risk#RiskIndices | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Rates the significance of risks based on ratings applied to factors which are believed to influence the magnitude of the risk. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | RiskMatrix | Prefix | risk |
---|---|---|---|
Label | Risk Matrix | ||
IRI | https://w3id.org/dpv/risk#RiskMatrix | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Compares individual risks by selecting a consequence/ likelihood pair and displaying them on a matrix with consequence on one axis and likelihood on the other. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | RiskMatrix3x3 | Prefix | risk |
---|---|---|---|
Label | Risk Matrix 3x3 | ||
IRI | https://w3id.org/dpv/risk#RiskMatrix3x3 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | A Risk Matrix with 3 Likelihood, 3 Severity, and 3 Risk Level types | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RiskMatrix5x5 | Prefix | risk |
---|---|---|---|
Label | Risk Matrix 5x5 | ||
IRI | https://w3id.org/dpv/risk#RiskMatrix5x5 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | A Risk Matrix with 5 Likelihood, 5 Severity, and 5 Risk Level types | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RiskMatrix7x7 | Prefix | risk |
---|---|---|---|
Label | Risk Matrix 7x7 | ||
IRI | https://w3id.org/dpv/risk#RiskMatrix7x7 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | A Risk Matrix with 7 Likelihood, 7 Severity, and 7 Risk Level types | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RiskRegisters | Prefix | risk |
---|---|---|---|
Label | Risk Registers | ||
IRI | https://w3id.org/dpv/risk#RiskRegisters | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | A means of recording information about risks and tracking actions. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | RM3x3S1L1 | Prefix | risk |
---|---|---|---|
Label | Low Risk (RM3x3 S:1 L:1) | ||
IRI | https://w3id.org/dpv/risk#RM3x3S1L1 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix3x3 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix3x3 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 3x3 Risk Matrix with Risk Severity: Low; Likelihood: Low; and Risk Level: Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM3x3S1L2 | Prefix | risk |
---|---|---|---|
Label | Low Risk (RM3x3 S:1 L:2) | ||
IRI | https://w3id.org/dpv/risk#RM3x3S1L2 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix3x3 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix3x3 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 3x3 Risk Matrix with Risk Severity: Low; Likelihood: Moderate; and Risk Level: Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM3x3S1L3 | Prefix | risk |
---|---|---|---|
Label | Moderate Risk (RM3x3 S:1 L:3) | ||
IRI | https://w3id.org/dpv/risk#RM3x3S1L3 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix3x3 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix3x3 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 3x3 Risk Matrix with Risk Severity: Low; Likelihood: High; and Risk Level: Moderate | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM3x3S2L1 | Prefix | risk |
---|---|---|---|
Label | Low Risk (RM3x3 S:2 L:1) | ||
IRI | https://w3id.org/dpv/risk#RM3x3S2L1 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix3x3 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix3x3 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 3x3 Risk Matrix with Risk Severity: Moderate; Likelihood: Low; and Risk Level: Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM3x3S2L2 | Prefix | risk |
---|---|---|---|
Label | Moderate Risk (RM3x3 S:2 L:2) | ||
IRI | https://w3id.org/dpv/risk#RM3x3S2L2 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix3x3 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix3x3 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 3x3 Risk Matrix with Risk Severity: Moderate; Likelihood: Moderate; and Risk Level: Moderate | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM3x3S2L3 | Prefix | risk |
---|---|---|---|
Label | High Risk (RM3x3 S:2 L:3) | ||
IRI | https://w3id.org/dpv/risk#RM3x3S2L3 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix3x3 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix3x3 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 3x3 Risk Matrix with Risk Severity: Moderate; Likelihood: High; and Risk Level: High | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM3x3S3L1 | Prefix | risk |
---|---|---|---|
Label | Moderate Risk (RM3x3 S:3 L:1) | ||
IRI | https://w3id.org/dpv/risk#RM3x3S3L1 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix3x3 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix3x3 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 3x3 Risk Matrix with Risk Severity: High; Likelihood: Low; and Risk Level: Moderate | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM3x3S3L2 | Prefix | risk |
---|---|---|---|
Label | High Risk (RM3x3 S:3 L:2) | ||
IRI | https://w3id.org/dpv/risk#RM3x3S3L2 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix3x3 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix3x3 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 3x3 Risk Matrix with Risk Severity: High; Likelihood: Moderate; and Risk Level: High | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM3x3S3L3 | Prefix | risk |
---|---|---|---|
Label | High Risk (RM3x3 S:3 L:3) | ||
IRI | https://w3id.org/dpv/risk#RM3x3S3L3 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix3x3 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix3x3 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 3x3 Risk Matrix with Risk Severity: High; Likelihood: High; and Risk Level: High | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM5x5S1L1 | Prefix | risk |
---|---|---|---|
Label | Very Low Risk (RM5x5 S:1 L:1) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S1L1 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: VeryLow; Likelihood: VeryLow; and Risk Level: VeryLow | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM5x5S1L2 | Prefix | risk |
---|---|---|---|
Label | Very Low Risk (RM5x5 S:1 L:2) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S1L2 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: VeryLow; Likelihood: Low; and Risk Level: VeryLow | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM5x5S1L3 | Prefix | risk |
---|---|---|---|
Label | Very Low Risk (RM5x5 S:1 L:3) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S1L3 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: VeryLow; Likelihood: Moderate; and Risk Level: VeryLow | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM5x5S1L4 | Prefix | risk |
---|---|---|---|
Label | Low Risk (RM5x5 S:1 L:4) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S1L4 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: VeryLow; Likelihood: High; and Risk Level: Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM5x5S1L5 | Prefix | risk |
---|---|---|---|
Label | Low Risk (RM5x5 S:1 L:5) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S1L5 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: VeryLow; Likelihood: VeryHigh; and Risk Level: Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM5x5S2L1 | Prefix | risk |
---|---|---|---|
Label | Very Low Risk (RM5x5 S:2 L:1) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S2L1 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: Low; Likelihood: VeryLow; and Risk Level: VeryLow | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM5x5S2L2 | Prefix | risk |
---|---|---|---|
Label | Low Risk (RM5x5 S:2 L:2) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S2L2 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: Low; Likelihood: Low; and Risk Level: Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM5x5S2L3 | Prefix | risk |
---|---|---|---|
Label | Moderate Risk (RM5x5 S:2 L:3) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S2L3 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: Low; Likelihood: Moderate; and Risk Level: Moderate | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM5x5S2L4 | Prefix | risk |
---|---|---|---|
Label | Moderate Risk (RM5x5 S:2 L:4) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S2L4 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: Low; Likelihood: High; and Risk Level: Moderate | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM5x5S2L5 | Prefix | risk |
---|---|---|---|
Label | High Risk (RM5x5 S:2 L:5) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S2L5 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: Low; Likelihood: VeryHigh; and Risk Level: High | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM5x5S3L1 | Prefix | risk |
---|---|---|---|
Label | Very Low Risk (RM5x5 S:3 L:1) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S3L1 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: Moderate; Likelihood: VeryLow; and Risk Level: VeryLow | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM5x5S3L2 | Prefix | risk |
---|---|---|---|
Label | Moderate Risk (RM5x5 S:3 L:2) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S3L2 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: Moderate; Likelihood: Low; and Risk Level: Moderate | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM5x5S3L3 | Prefix | risk |
---|---|---|---|
Label | Moderate Risk (RM5x5 S:3 L:3) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S3L3 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: Moderate; Likelihood: Moderate; and Risk Level: Moderate | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM5x5S3L4 | Prefix | risk |
---|---|---|---|
Label | High Risk (RM5x5 S:3 L:4) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S3L4 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: Moderate; Likelihood: High; and Risk Level: High | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM5x5S3L5 | Prefix | risk |
---|---|---|---|
Label | Very High Risk (RM5x5 S:3 L:5) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S3L5 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: Moderate; Likelihood: VeryHigh; and Risk Level: VeryHigh | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM5x5S4L1 | Prefix | risk |
---|---|---|---|
Label | Low Risk (RM5x5 S:4 L:1) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S4L1 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: High; Likelihood: VeryLow; and Risk Level: Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM5x5S4L2 | Prefix | risk |
---|---|---|---|
Label | Moderate Risk (RM5x5 S:4 L:2) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S4L2 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: High; Likelihood: Low; and Risk Level: Moderate | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM5x5S4L3 | Prefix | risk |
---|---|---|---|
Label | High Risk (RM5x5 S:4 L:3) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S4L3 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: High; Likelihood: Moderate; and Risk Level: High | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM5x5S4L4 | Prefix | risk |
---|---|---|---|
Label | Very High Risk (RM5x5 S:4 L:4) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S4L4 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: High; Likelihood: High; and Risk Level: VeryHigh | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM5x5S4L5 | Prefix | risk |
---|---|---|---|
Label | Very High Risk (RM5x5 S:4 L:5) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S4L5 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: High; Likelihood: VeryHigh; and Risk Level: VeryHigh | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM5x5S5L1 | Prefix | risk |
---|---|---|---|
Label | Low Risk (RM5x5 S:5 L:1) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S5L1 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: VeryHigh; Likelihood: VeryLow; and Risk Level: Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM5x5S5L2 | Prefix | risk |
---|---|---|---|
Label | High Risk (RM5x5 S:5 L:2) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S5L2 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: VeryHigh; Likelihood: Low; and Risk Level: High | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM5x5S5L3 | Prefix | risk |
---|---|---|---|
Label | High Risk (RM5x5 S:5 L:3) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S5L3 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: VeryHigh; Likelihood: Moderate; and Risk Level: High | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM5x5S5L4 | Prefix | risk |
---|---|---|---|
Label | Very High Risk (RM5x5 S:5 L:4) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S5L4 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: VeryHigh; Likelihood: High; and Risk Level: VeryHigh | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM5x5S5L5 | Prefix | risk |
---|---|---|---|
Label | Very High Risk (RM5x5 S:5 L:5) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S5L5 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: VeryHigh; Likelihood: VeryHigh; and Risk Level: VeryHigh | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S1L1 | Prefix | risk |
---|---|---|---|
Label | Extremely Low Risk (RM7x7 S:1 L:1) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S1L1 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: ExtremelyLow; Likelihood: ExtremelyLow; and Risk Level: ExtremelyLow | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S1L2 | Prefix | risk |
---|---|---|---|
Label | Extremely Low Risk (RM7x7 S:1 L:2) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S1L2 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: ExtremelyLow; Likelihood: VeryLow; and Risk Level: ExtremelyLow | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S1L3 | Prefix | risk |
---|---|---|---|
Label | Extremely Low Risk (RM7x7 S:1 L:3) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S1L3 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: ExtremelyLow; Likelihood: Low; and Risk Level: ExtremelyLow | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S1L4 | Prefix | risk |
---|---|---|---|
Label | Very Low Risk (RM7x7 S:1 L:4) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S1L4 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: ExtremelyLow; Likelihood: Moderate; and Risk Level: VeryLow | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S1L5 | Prefix | risk |
---|---|---|---|
Label | Very Low Risk (RM7x7 S:1 L:5) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S1L5 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: ExtremelyLow; Likelihood: High; and Risk Level: VeryLow | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S1L6 | Prefix | risk |
---|---|---|---|
Label | Very Low Risk (RM7x7 S:1 L:6) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S1L6 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: ExtremelyLow; Likelihood: VeryHigh; and Risk Level: VeryLow | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S1L7 | Prefix | risk |
---|---|---|---|
Label | Low Risk (RM7x7 S:1 L:7) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S1L7 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: ExtremelyLow; Likelihood: ExtremelyHigh; and Risk Level: Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S2L1 | Prefix | risk |
---|---|---|---|
Label | Extremely Low Risk (RM7x7 S:2 L:1) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S2L1 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: VeryLow; Likelihood: ExtremelyLow; and Risk Level: ExtremelyLow | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S2L2 | Prefix | risk |
---|---|---|---|
Label | Extremely Low Risk (RM7x7 S:2 L:2) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S2L2 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: VeryLow; Likelihood: VeryLow; and Risk Level: ExtremelyLow | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S2L3 | Prefix | risk |
---|---|---|---|
Label | Very Low Risk (RM7x7 S:2 L:3) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S2L3 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: VeryLow; Likelihood: Low; and Risk Level: VeryLow | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S2L4 | Prefix | risk |
---|---|---|---|
Label | Low Risk (RM7x7 S:2 L:4) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S2L4 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: VeryLow; Likelihood: Moderate; and Risk Level: Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S2L5 | Prefix | risk |
---|---|---|---|
Label | Low Risk (RM7x7 S:2 L:5) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S2L5 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: VeryLow; Likelihood: High; and Risk Level: Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S2L6 | Prefix | risk |
---|---|---|---|
Label | Moderate Risk (RM7x7 S:2 L:6) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S2L6 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: VeryLow; Likelihood: VeryHigh; and Risk Level: Moderate | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S2L7 | Prefix | risk |
---|---|---|---|
Label | Moderate Risk (RM7x7 S:2 L:7) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S2L7 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: VeryLow; Likelihood: ExtremelyHigh; and Risk Level: Moderate | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S3L1 | Prefix | risk |
---|---|---|---|
Label | Extremely Low Risk (RM7x7 S:3 L:1) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S3L1 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Low; Likelihood: ExtremelyLow; and Risk Level: ExtremelyLow | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S3L2 | Prefix | risk |
---|---|---|---|
Label | Very Low Risk (RM7x7 S:3 L:2) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S3L2 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Low; Likelihood: VeryLow; and Risk Level: VeryLow | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S3L3 | Prefix | risk |
---|---|---|---|
Label | Low Risk (RM7x7 S:3 L:3) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S3L3 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Low; Likelihood: Low; and Risk Level: Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S3L4 | Prefix | risk |
---|---|---|---|
Label | Moderate Risk (RM7x7 S:3 L:4) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S3L4 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Low; Likelihood: Moderate; and Risk Level: Moderate | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S3L5 | Prefix | risk |
---|---|---|---|
Label | High Risk (RM7x7 S:3 L:5) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S3L5 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Low; Likelihood: High; and Risk Level: High | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S3L6 | Prefix | risk |
---|---|---|---|
Label | High Risk (RM7x7 S:3 L:6) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S3L6 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Low; Likelihood: VeryHigh; and Risk Level: High | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S3L7 | Prefix | risk |
---|---|---|---|
Label | Very High Risk (RM7x7 S:3 L:7) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S3L7 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Low; Likelihood: ExtremelyHigh; and Risk Level: VeryHigh | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S4L1 | Prefix | risk |
---|---|---|---|
Label | Extremely Low Risk (RM7x7 S:4 L:1) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S4L1 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Moderate; Likelihood: ExtremelyLow; and Risk Level: ExtremelyLow | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S4L2 | Prefix | risk |
---|---|---|---|
Label | Low Risk (RM7x7 S:4 L:2) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S4L2 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Moderate; Likelihood: VeryLow; and Risk Level: Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S4L3 | Prefix | risk |
---|---|---|---|
Label | Moderate Risk (RM7x7 S:4 L:3) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S4L3 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Moderate; Likelihood: Low; and Risk Level: Moderate | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S4L4 | Prefix | risk |
---|---|---|---|
Label | High Risk (RM7x7 S:4 L:4) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S4L4 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Moderate; Likelihood: Moderate; and Risk Level: High | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S4L5 | Prefix | risk |
---|---|---|---|
Label | High Risk (RM7x7 S:4 L:5) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S4L5 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Moderate; Likelihood: High; and Risk Level: High | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S4L6 | Prefix | risk |
---|---|---|---|
Label | Very High Risk (RM7x7 S:4 L:6) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S4L6 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Moderate; Likelihood: VeryHigh; and Risk Level: VeryHigh | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S4L7 | Prefix | risk |
---|---|---|---|
Label | Very High Risk (RM7x7 S:4 L:7) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S4L7 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Moderate; Likelihood: ExtremelyHigh; and Risk Level: VeryHigh | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S5L1 | Prefix | risk |
---|---|---|---|
Label | Very Low Risk (RM7x7 S:5 L:1) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S5L1 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: High; Likelihood: ExtremelyLow; and Risk Level: VeryLow | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S5L2 | Prefix | risk |
---|---|---|---|
Label | Low Risk (RM7x7 S:5 L:2) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S5L2 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: High; Likelihood: VeryLow; and Risk Level: Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S5L3 | Prefix | risk |
---|---|---|---|
Label | Moderate Risk (RM7x7 S:5 L:3) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S5L3 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: High; Likelihood: Low; and Risk Level: Moderate | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S5L4 | Prefix | risk |
---|---|---|---|
Label | High Risk (RM7x7 S:5 L:4) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S5L4 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: High; Likelihood: Moderate; and Risk Level: High | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S5L5 | Prefix | risk |
---|---|---|---|
Label | Very High Risk (RM7x7 S:5 L:5) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S5L5 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: High; Likelihood: High; and Risk Level: VeryHigh | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S5L6 | Prefix | risk |
---|---|---|---|
Label | Extremely High Risk (RM7x7 S:5 L:6) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S5L6 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: High; Likelihood: VeryHigh; and Risk Level: ExtremelyHigh | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S5L7 | Prefix | risk |
---|---|---|---|
Label | Extremely High Risk (RM7x7 S:5 L:7) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S5L7 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: High; Likelihood: ExtremelyHigh; and Risk Level: ExtremelyHigh | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S6L1 | Prefix | risk |
---|---|---|---|
Label | Very Low Risk (RM7x7 S:6 L:1) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S6L1 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: VeryHigh; Likelihood: ExtremelyLow; and Risk Level: VeryLow | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S6L2 | Prefix | risk |
---|---|---|---|
Label | Moderate Risk (RM7x7 S:6 L:2) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S6L2 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: VeryHigh; Likelihood: VeryLow; and Risk Level: Moderate | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S6L3 | Prefix | risk |
---|---|---|---|
Label | High Risk (RM7x7 S:6 L:3) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S6L3 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: VeryHigh; Likelihood: Low; and Risk Level: High | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S6L4 | Prefix | risk |
---|---|---|---|
Label | Very High Risk (RM7x7 S:6 L:4) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S6L4 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: VeryHigh; Likelihood: Moderate; and Risk Level: VeryHigh | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S6L5 | Prefix | risk |
---|---|---|---|
Label | Very High Risk (RM7x7 S:6 L:5) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S6L5 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: VeryHigh; Likelihood: High; and Risk Level: VeryHigh | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S6L6 | Prefix | risk |
---|---|---|---|
Label | Extremely High Risk (RM7x7 S:6 L:6) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S6L6 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: VeryHigh; Likelihood: VeryHigh; and Risk Level: ExtremelyHigh | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S6L7 | Prefix | risk |
---|---|---|---|
Label | Extremely High Risk (RM7x7 S:6 L:7) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S6L7 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: VeryHigh; Likelihood: ExtremelyHigh; and Risk Level: ExtremelyHigh | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S7L1 | Prefix | risk |
---|---|---|---|
Label | Low Risk (RM7x7 S:7 L:1) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S7L1 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: ExtremelyHigh; Likelihood: ExtremelyLow; and Risk Level: Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S7L2 | Prefix | risk |
---|---|---|---|
Label | Moderate Risk (RM7x7 S:7 L:2) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S7L2 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: ExtremelyHigh; Likelihood: VeryLow; and Risk Level: Moderate | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S7L3 | Prefix | risk |
---|---|---|---|
Label | High Risk (RM7x7 S:7 L:3) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S7L3 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: ExtremelyHigh; Likelihood: Low; and Risk Level: High | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S7L4 | Prefix | risk |
---|---|---|---|
Label | Very High Risk (RM7x7 S:7 L:4) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S7L4 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: ExtremelyHigh; Likelihood: Moderate; and Risk Level: VeryHigh | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S7L5 | Prefix | risk |
---|---|---|---|
Label | Extremely High Risk (RM7x7 S:7 L:5) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S7L5 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: ExtremelyHigh; Likelihood: High; and Risk Level: ExtremelyHigh | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S7L6 | Prefix | risk |
---|---|---|---|
Label | Extremely High Risk (RM7x7 S:7 L:6) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S7L6 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: ExtremelyHigh; Likelihood: VeryHigh; and Risk Level: ExtremelyHigh | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | RM7x7S7L7 | Prefix | risk |
---|---|---|---|
Label | Extremely High Risk (RM7x7 S:7 L:7) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S7L7 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: ExtremelyHigh; Likelihood: ExtremelyHigh; and Risk Level: ExtremelyHigh | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-MATRIX in RISK |
Term | Sabotage | Prefix | risk |
---|---|---|---|
Label | Sabotage | ||
IRI | https://w3id.org/dpv/risk#Sabotage | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Harm → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | Scam | Prefix | risk |
---|---|---|---|
Label | Scam | ||
IRI | https://w3id.org/dpv/risk#Scam | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Harm → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | ScenarioAnalysis | Prefix | risk |
---|---|---|---|
Label | Scenario Analysis | ||
IRI | https://w3id.org/dpv/risk#ScenarioAnalysis | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Identifies possible future scenarios through imagination, extrapolation from the present or modelling. Risk is then considered for each of these scenarios. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | SCurves | Prefix | risk |
---|---|---|---|
Label | S-curves | ||
IRI | https://w3id.org/dpv/risk#SCurves | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | A means of displaying the relationship between consequences and their likelihood plotted as a cumulative distribution function (S-curve). | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | SecurityBreach | Prefix | risk |
---|---|---|---|
Label | Security Breach | ||
IRI | https://w3id.org/dpv/risk#SecurityBreach | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | ServiceInterruption | Prefix | risk |
---|---|---|---|
Label | Service Interruption | ||
IRI | https://w3id.org/dpv/risk#ServiceInterruption | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | SexualViolence | Prefix | risk |
---|---|---|---|
Label | Sexual Violence | ||
IRI | https://w3id.org/dpv/risk#SexualViolence | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Harm → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | SFAIRP | Prefix | risk |
---|---|---|---|
Label | SFAIRP | ||
IRI | https://w3id.org/dpv/risk#SFAIRP | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Broader/Parent types | risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | So far as is Resonably Practiceable (ALARP) - A criteria for deciding significance of risk and means of evaluating tolerability of risk | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | SocialDisadvantage | Prefix | risk |
---|---|---|---|
Label | Social Disadvantage | ||
IRI | https://w3id.org/dpv/risk#SocialDisadvantage | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Date Created | 2022-08-19 | ||
Contributors | Georg P. Krog | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | Spam | Prefix | risk |
---|---|---|---|
Label | Spam | ||
IRI | https://w3id.org/dpv/risk#Spam | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Harm → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | Spoofing | Prefix | risk |
---|---|---|---|
Label | Spoofing | ||
IRI | https://w3id.org/dpv/risk#Spoofing | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Harm → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | Spying | Prefix | risk |
---|---|---|---|
Label | Spying | ||
IRI | https://w3id.org/dpv/risk#Spying | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:NonMaterialDamage → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | Stalking | Prefix | risk |
---|---|---|---|
Label | Stalking | ||
IRI | https://w3id.org/dpv/risk#Stalking | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:NonMaterialDamage → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | Surveys | Prefix | risk |
---|---|---|---|
Label | Surveys | ||
IRI | https://w3id.org/dpv/risk#Surveys | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Paper- or computer-based questionnaires to elicit views. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | SWIFT | Prefix | risk |
---|---|---|---|
Label | Structured "What If?" (SWIFT) | ||
IRI | https://w3id.org/dpv/risk#SWIFT | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | A simpler form of HAZOP with prompts of "what if" to identify deviations from the expected. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | SystemFailure | Prefix | risk |
---|---|---|---|
Label | System Failure | ||
IRI | https://w3id.org/dpv/risk#SystemFailure | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Threat Landscape for Ransomware Attacks 2022 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | SystemIntrusion | Prefix | risk |
---|---|---|---|
Label | System Intrusion | ||
IRI | https://w3id.org/dpv/risk#SystemIntrusion | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | SystemMalfunction | Prefix | risk |
---|---|---|---|
Label | System Malfunction | ||
IRI | https://w3id.org/dpv/risk#SystemMalfunction | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | Taxonomies | Prefix | risk |
---|---|---|---|
Label | Taxonomies | ||
IRI | https://w3id.org/dpv/risk#Taxonomies | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QualitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | A taxonomy based on experience or on concepts and models that can be used to help identify risks or controls. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | Terrorism | Prefix | risk |
---|---|---|---|
Label | Terrorism | ||
IRI | https://w3id.org/dpv/risk#Terrorism | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Harm → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | Theft | Prefix | risk |
---|---|---|---|
Label | Theft | ||
IRI | https://w3id.org/dpv/risk#Theft | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:MaterialDamage → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | TheftEquipment | Prefix | risk |
---|---|---|---|
Label | Theft of Equipment | ||
IRI | https://w3id.org/dpv/risk#TheftEquipment | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:MaterialDamage → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | TheftMedia | Prefix | risk |
---|---|---|---|
Label | Theft of Media | ||
IRI | https://w3id.org/dpv/risk#TheftMedia | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:MaterialDamage → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | ThirdPartyOperationDisruption | Prefix | risk |
---|---|---|---|
Label | Third Party Operation Disruption | ||
IRI | https://w3id.org/dpv/risk#ThirdPartyOperationDisruption | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | Toxicological | Prefix | risk |
---|---|---|---|
Label | Toxicological Risk Assessment | ||
IRI | https://w3id.org/dpv/risk#Toxicological | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | A series of steps taken to obtain a measure for the risk to humans or ecological systems due to exposure to chemicals. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | UnauthorisedAccesstoPremises | Prefix | risk |
---|---|---|---|
Label | Unauthorised Access to Premises | ||
IRI | https://w3id.org/dpv/risk#UnauthorisedAccesstoPremises | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | UnauthorisedCodeAccess | Prefix | risk |
---|---|---|---|
Label | Unauthorised Code Access | ||
IRI | https://w3id.org/dpv/risk#UnauthorisedCodeAccess | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Methodology for Sectoral Cybersecurity Assessments | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | UnauthorisedCodeDisclosure | Prefix | risk |
---|---|---|---|
Label | Unauthorised Code Disclosure | ||
IRI | https://w3id.org/dpv/risk#UnauthorisedCodeDisclosure | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Methodology for Sectoral Cybersecurity Assessments | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | UnauthorisedCodeModification | Prefix | risk |
---|---|---|---|
Label | Unauthorised Code Modification | ||
IRI | https://w3id.org/dpv/risk#UnauthorisedCodeModification | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Methodology for Sectoral Cybersecurity Assessments | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | UnauthorisedDataAccess | Prefix | risk |
---|---|---|---|
Label | Unauthorised Data Access | ||
IRI | https://w3id.org/dpv/risk#UnauthorisedDataAccess | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | UnauthorisedDataDisclosure | Prefix | risk |
---|---|---|---|
Label | Unauthorised Data Disclosure | ||
IRI | https://w3id.org/dpv/risk#UnauthorisedDataDisclosure | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | UnauthorisedDataModification | Prefix | risk |
---|---|---|---|
Label | Unauthorised Data Modification | ||
IRI | https://w3id.org/dpv/risk#UnauthorisedDataModification | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:NonMaterialDamage → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | UnauthorisedImpersonation | Prefix | risk |
---|---|---|---|
Label | Unauthorised Impersonation | ||
IRI | https://w3id.org/dpv/risk#UnauthorisedImpersonation | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:NonMaterialDamage → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | UnauthorisedInformationDisclosure | Prefix | risk |
---|---|---|---|
Label | Unauthorised Information Disclosure | ||
IRI | https://w3id.org/dpv/risk#UnauthorisedInformationDisclosure | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | UnauthorisedReIdentification | Prefix | risk |
---|---|---|---|
Label | Unauthorised Re-Identification | ||
IRI | https://w3id.org/dpv/risk#UnauthorisedReIdentification | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence | ||
Date Created | 2022-08-19 | ||
Contributors | Georg P. Krog | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | UnauthorisedResourceUse | Prefix | risk |
---|---|---|---|
Label | Unauthorised Resource Use | ||
IRI | https://w3id.org/dpv/risk#UnauthorisedResourceUse | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | UnauthorisedSystemAccess | Prefix | risk |
---|---|---|---|
Label | Unauthorised System Access | ||
IRI | https://w3id.org/dpv/risk#UnauthorisedSystemAccess | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | UnauthorisedSystemModification | Prefix | risk |
---|---|---|---|
Label | Unauthorised System Modification | ||
IRI | https://w3id.org/dpv/risk#UnauthorisedSystemModification | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Methodology for Sectoral Cybersecurity Assessments | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | UnknownVulnerabilityExploited | Prefix | risk |
---|---|---|---|
Label | Unknown Vulnerability Exploited | ||
IRI | https://w3id.org/dpv/risk#UnknownVulnerabilityExploited | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | UnwantedCodeDeletion | Prefix | risk |
---|---|---|---|
Label | Unwanted Code Deletion | ||
IRI | https://w3id.org/dpv/risk#UnwantedCodeDeletion | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Methodology for Sectoral Cybersecurity Assessments | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | UnwantedDataDeletion | Prefix | risk |
---|---|---|---|
Label | Unwanted Data Deletion | ||
IRI | https://w3id.org/dpv/risk#UnwantedDataDeletion | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | UnwantedDisclosureData | Prefix | risk |
---|---|---|---|
Label | Unwanted Disclosure of Data | ||
IRI | https://w3id.org/dpv/risk#UnwantedDisclosureData | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | Vandalism | Prefix | risk |
---|---|---|---|
Label | Vandalism | ||
IRI | https://w3id.org/dpv/risk#Vandalism | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Threat Taxonomy 2016 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | VaR | Prefix | risk |
---|---|---|---|
Label | Value At Risk (VaR) | ||
IRI | https://w3id.org/dpv/risk#VaR | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:QuantitativeRiskAnalysis → risk:RiskAnalysis → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Financial measure of risk that uses an assumed probability distribution of losses in a stable market condition to calculate the value of a loss that might occur with a specified probability within a defined time span. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-ASSESSMENT in RISK |
Term | VeryHighLikelihood | Prefix | risk |
---|---|---|---|
Label | Very High Likelihood | ||
IRI | https://w3id.org/dpv/risk#VeryHighLikelihood | ||
Type | rdfs:Class, skos:Concept, dpv:Likelihood | ||
Broader/Parent types | risk:5LikelihoodLevels → dpv:Likelihood | ||
Broader/Parent types | risk:7LikelihoodLevels → dpv:Likelihood | ||
Object of relation | dpv:hasLikelihood | ||
Definition | Level where Likelihood is Very High | ||
Usage Note | The suggested quantitative value for this concept is 0.9 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-LEVELS in RISK |
Term | VeryHighRisk | Prefix | risk |
---|---|---|---|
Label | Very High Risk | ||
IRI | https://w3id.org/dpv/risk#VeryHighRisk | ||
Type | rdfs:Class, skos:Concept, dpv:RiskLevel | ||
Broader/Parent types | risk:5RiskLevels → dpv:RiskLevel | ||
Broader/Parent types | risk:7RiskLevels → dpv:RiskLevel | ||
Object of relation | dpv:hasRiskLevel | ||
Definition | Level where Risk is Very High | ||
Usage Note | The suggested quantitative value for this concept is 0.9 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-LEVELS in RISK |
Term | VeryHighSeverity | Prefix | risk |
---|---|---|---|
Label | Very High Severity | ||
IRI | https://w3id.org/dpv/risk#VeryHighSeverity | ||
Type | rdfs:Class, skos:Concept, dpv:Severity | ||
Broader/Parent types | risk:5SeverityLevels → dpv:Severity | ||
Broader/Parent types | risk:7SeverityLevels → dpv:Severity | ||
Object of relation | dpv:hasSeverity | ||
Definition | Level where Severity is Very High | ||
Usage Note | The suggested quantitative value for this concept is 0.9 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-LEVELS in RISK |
Term | VeryLowLikelihood | Prefix | risk |
---|---|---|---|
Label | Very Low Likelihood | ||
IRI | https://w3id.org/dpv/risk#VeryLowLikelihood | ||
Type | rdfs:Class, skos:Concept, dpv:Likelihood | ||
Broader/Parent types | risk:5LikelihoodLevels → dpv:Likelihood | ||
Broader/Parent types | risk:7LikelihoodLevels → dpv:Likelihood | ||
Object of relation | dpv:hasLikelihood | ||
Definition | Level where Likelihood is Very Low | ||
Usage Note | The suggested quantitative value for this concept is 0.1 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-LEVELS in RISK |
Term | VeryLowRisk | Prefix | risk |
---|---|---|---|
Label | Very Low Risk | ||
IRI | https://w3id.org/dpv/risk#VeryLowRisk | ||
Type | rdfs:Class, skos:Concept, dpv:RiskLevel | ||
Broader/Parent types | risk:5RiskLevels → dpv:RiskLevel | ||
Broader/Parent types | risk:7RiskLevels → dpv:RiskLevel | ||
Object of relation | dpv:hasRiskLevel | ||
Definition | Level where Risk is Very Low | ||
Usage Note | The suggested quantitative value for this concept is 0.1 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-LEVELS in RISK |
Term | VeryLowSeverity | Prefix | risk |
---|---|---|---|
Label | Very Low Severity | ||
IRI | https://w3id.org/dpv/risk#VeryLowSeverity | ||
Type | rdfs:Class, skos:Concept, dpv:Severity | ||
Broader/Parent types | risk:5SeverityLevels → dpv:Severity | ||
Broader/Parent types | risk:7SeverityLevels → dpv:Severity | ||
Object of relation | dpv:hasSeverity | ||
Definition | Level where Severity is Very Low | ||
Usage Note | The suggested quantitative value for this concept is 0.1 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-LEVELS in RISK |
Term | ViolationCodeConduct | Prefix | risk |
---|---|---|---|
Label | Violation of Code of Conduct | ||
IRI | https://w3id.org/dpv/risk#ViolationCodeConduct | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | ViolationContractualObligations | Prefix | risk |
---|---|---|---|
Label | Violation of Contractual Obligations | ||
IRI | https://w3id.org/dpv/risk#ViolationContractualObligations | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | ViolationEthicalCode | Prefix | risk |
---|---|---|---|
Label | Violation of Ethical Code | ||
IRI | https://w3id.org/dpv/risk#ViolationEthicalCode | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | ViolationOfRights | Prefix | risk |
---|---|---|---|
Label | Violation of Rights | ||
IRI | https://w3id.org/dpv/risk#ViolationOfRights | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Harm → dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Date Created | 2022-08-18 | ||
Contributors | Georg P. Krog, Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | ViolationRegulatoryObligations | Prefix | risk |
---|---|---|---|
Label | Violation of Regulatory Obligations | ||
IRI | https://w3id.org/dpv/risk#ViolationRegulatoryObligations | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | ViolationStatutoryObligations | Prefix | risk |
---|---|---|---|
Label | Violation of Statutory Obligations | ||
IRI | https://w3id.org/dpv/risk#ViolationStatutoryObligations | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Damage → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | VulnerabilityCreated | Prefix | risk |
---|---|---|---|
Label | Vulnerability Created | ||
IRI | https://w3id.org/dpv/risk#VulnerabilityCreated | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
Term | VulnerabilityExploited | Prefix | risk |
---|---|---|---|
Label | Vulnerability Exploited | ||
IRI | https://w3id.org/dpv/risk#VulnerabilityExploited | ||
Type | rdfs:Class, skos:Concept, dpv:Consequence | ||
Broader/Parent types | dpv:Detriment → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasConsequenceOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More | section RISK-CONSEQUENCES in RISK |
DPV uses the following terms from [[RDF]] and [[RDFS]] with their defined meanings:
The following external concepts are re-used within DPV:
The DPVCG and DPV were initiated as part of the SPECIAL H2020 Project, which received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No. 731601. The SPECIAL project ran over a 3-year period from 2017 to 2019.
Harshvardhan J. Pandit was funded by the Irish Research Council Government of Ireland Postdoctoral Fellowship Grant#GOIPD/2020/790 for working within the DPVCG and contributing to the DPV. The fellowship lasted from 2020 to 2022.
The contributions of Harshvardhan J. Pandit have received funding from the ADAPT SFI Centre for Digital Media Technology is funded by Science Foundation Ireland through the SFI Research Centres Programme and is co-funded under the European Regional Development Fund (ERDF) through Grant#13/RC/2106 (2018 to 2020) and Grant#13/RC/2106_P2 (2021 onwards)