This document describes (only) the
Term | 3LikelihoodLevels | Prefix | risk-owl |
---|---|---|---|
Label | 3 Likelihood Levels | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#3LikelihoodLevels https://w3id.org/dpv/risk#3LikelihoodLevels | ||
Type | rdfs:Class , owl:Class , dpv-owl:Likelihood | ||
Sub-class of | dpv-owl:Likelihood | ||
in Range of | dpv-owl:hasLikelihood | ||
Definition | Scale with 3 Likelihood Levels from High to Low | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-levels |
Term | 3RiskLevels | Prefix | risk-owl |
---|---|---|---|
Label | 3 Risk Levels | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#3RiskLevels https://w3id.org/dpv/risk#3RiskLevels | ||
Type | rdfs:Class , owl:Class , dpv-owl:RiskLevel | ||
Sub-class of | dpv-owl:RiskLevel | ||
in Range of | dpv-owl:hasRiskLevel | ||
Definition | Scale with 3 Risk Levels from High to Low | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-levels |
Term | 3SeverityLevels | Prefix | risk-owl |
---|---|---|---|
Label | 3 Severity Levels | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#3SeverityLevels https://w3id.org/dpv/risk#3SeverityLevels | ||
Type | rdfs:Class , owl:Class , dpv-owl:Severity | ||
Sub-class of | dpv-owl:Severity | ||
in Range of | dpv-owl:hasSeverity | ||
Definition | Scale with 3 Severity Levels from High to Low | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-levels |
Term | 5LikelihoodLevels | Prefix | risk-owl |
---|---|---|---|
Label | 5 Likelihood Levels | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#5LikelihoodLevels https://w3id.org/dpv/risk#5LikelihoodLevels | ||
Type | rdfs:Class , owl:Class , dpv-owl:Likelihood | ||
Sub-class of | dpv-owl:Likelihood | ||
in Range of | dpv-owl:hasLikelihood | ||
Definition | Scale with 5 Likelihood Levels from Very High to Very Low | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-levels |
Term | 5RiskLevels | Prefix | risk-owl |
---|---|---|---|
Label | 5 Risk Levels | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#5RiskLevels https://w3id.org/dpv/risk#5RiskLevels | ||
Type | rdfs:Class , owl:Class , dpv-owl:RiskLevel | ||
Sub-class of | dpv-owl:RiskLevel | ||
in Range of | dpv-owl:hasRiskLevel | ||
Definition | Scale with 5 Risk Levels from Very High to Very Low | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-levels |
Term | 5SeverityLevels | Prefix | risk-owl |
---|---|---|---|
Label | 5 Severity Levels | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#5SeverityLevels https://w3id.org/dpv/risk#5SeverityLevels | ||
Type | rdfs:Class , owl:Class , dpv-owl:Severity | ||
Sub-class of | dpv-owl:Severity | ||
in Range of | dpv-owl:hasSeverity | ||
Definition | Scale with 5 Severity Levels from Very High to Very Low | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-levels |
Term | 7LikelihoodLevels | Prefix | risk-owl |
---|---|---|---|
Label | 7 Likelihood Levels | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#7LikelihoodLevels https://w3id.org/dpv/risk#7LikelihoodLevels | ||
Type | rdfs:Class , owl:Class , dpv-owl:Likelihood | ||
Sub-class of | dpv-owl:Likelihood | ||
in Range of | dpv-owl:hasLikelihood | ||
Definition | Scale with 7 Likelihood Levels from Extremely High to Extremely Low | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-levels |
Term | 7RiskLevels | Prefix | risk-owl |
---|---|---|---|
Label | 7 Risk Levels | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#7RiskLevels https://w3id.org/dpv/risk#7RiskLevels | ||
Type | rdfs:Class , owl:Class , dpv-owl:RiskLevel | ||
Sub-class of | dpv-owl:RiskLevel | ||
in Range of | dpv-owl:hasRiskLevel | ||
Definition | Scale with 7 Risk Levels from Extremely High to Extremely Low | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-levels |
Term | 7SeverityLevels | Prefix | risk-owl |
---|---|---|---|
Label | 7 Severity Levels | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#7SeverityLevels https://w3id.org/dpv/risk#7SeverityLevels | ||
Type | rdfs:Class , owl:Class , dpv-owl:Severity | ||
Sub-class of | dpv-owl:Severity | ||
in Range of | dpv-owl:hasSeverity | ||
Definition | Scale with 7 Severity Levels from Extremely High to Extremely Low | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-levels |
Term | AbusiveContentUtilisation | Prefix | risk-owl |
---|---|---|---|
Label | Abusive Content Utilisation | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#AbusiveContentUtilisation https://w3id.org/dpv/risk#AbusiveContentUtilisation | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Harm → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | ACSC-ISM | Prefix | risk-owl |
---|---|---|---|
Label | ACSC-ISM | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ACSC-ISM https://w3id.org/dpv/risk#ACSC-ISM | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | The Australian Cyber Security Centre (ACSC) published the Australian Government Information Security Manual (ISM) which adopts the use of a risk management framework that draws from NIST 800-37, and includes six steps: define the system, select security controls, implement security controls, assess security controls, authorise the system and monitor the system | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | ALARA | Prefix | risk-owl |
---|---|---|---|
Label | ALARA | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ALARA https://w3id.org/dpv/risk#ALARA | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QualitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
Sub-class of | risk-owl:QuantitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | As Low as Resonably Achievable (ALARP) - A criteria for deciding significance of risk and means of evaluating tolerability of risk | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | ALARP | Prefix | risk-owl |
---|---|---|---|
Label | ALARP | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ALARP https://w3id.org/dpv/risk#ALARP | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QualitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
Sub-class of | risk-owl:QuantitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | As Low as Resonably Possible (ALARP) - A criteria for deciding significance of risk and means of evaluating tolerability of risk | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | ANSI-ISA-62443-3-2-2020 | Prefix | risk-owl |
---|---|---|---|
Label | ANSI/ISA-62443-3‑2-2020 | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ANSI-ISA-62443-3-2-2020 https://w3id.org/dpv/risk#ANSI-ISA-62443-3-2-2020 | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | ANSI/ISA-62443-3-2-2020 standard, entitled ‘Security for industrial automation and control systems, Part 3-2: Security risk assessment for system design’, from the International Society of Automation (ISA), dedicates an entire part to the assessment of security risk for system design targeting Security and IT professionals | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | AttackonPrivateLife | Prefix | risk-owl |
---|---|---|---|
Label | Attack on Private Life | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#AttackonPrivateLife https://w3id.org/dpv/risk#AttackonPrivateLife | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Harm → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | AuthorisationFailure | Prefix | risk-owl |
---|---|---|---|
Label | Authorisation Failure | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#AuthorisationFailure https://w3id.org/dpv/risk#AuthorisationFailure | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISa Trust Services Security Incidents 2021 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | AvoidSource | Prefix | risk-owl |
---|---|---|---|
Label | Avoid Source | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#AvoidSource https://w3id.org/dpv/risk#AvoidSource | ||
Type | rdfs:Class , owl:Class , dpv-owl:RiskMitigationMeasure | ||
Sub-class of | risk-owl:ControlRiskSource → dpv-owl:RiskMitigationMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Domain of | dpv-owl:mitigatesRisk | ||
in Range of | dpv-owl:hasTechnicalOrganisationalMeasure, dpv-owl:isMitigatedByMeasure | ||
Definition | Risk Control that avoids the risk source | ||
Date Created | 2022-08-21 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-controls |
Term | BayesianAnalysis | Prefix | risk-owl |
---|---|---|---|
Label | Bayesian Analysis | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#BayesianAnalysis https://w3id.org/dpv/risk#BayesianAnalysis | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QuantitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | A means of making inference about model parameters using Bayes' theorem which has the capability of incorporating empirical data into prior judgements about probabilities | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | BayesianNetworks | Prefix | risk-owl |
---|---|---|---|
Label | Bayesian Networks | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#BayesianNetworks https://w3id.org/dpv/risk#BayesianNetworks | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QuantitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | A graphical model of variables and their cause-effect relationships expressed using probabilities | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | Blackmail | Prefix | risk-owl |
---|---|---|---|
Label | Blackmail | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#Blackmail https://w3id.org/dpv/risk#Blackmail | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Harm → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | BowTie | Prefix | risk-owl |
---|---|---|---|
Label | Bow Tie Analysis | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#BowTie https://w3id.org/dpv/risk#BowTie | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QualitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
Sub-class of | risk-owl:QuantitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | A diagrammatic way of describing the pathways from sources of risk to outcomes, and of reviewing controls | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | Brainstorming | Prefix | risk-owl |
---|---|---|---|
Label | Brainstorming | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#Brainstorming https://w3id.org/dpv/risk#Brainstorming | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QualitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | Technique used in workshops to encourage imaginative thinking | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | BruteForceAuthorisations | Prefix | risk-owl |
---|---|---|---|
Label | Brute Force Authorisations | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#BruteForceAuthorisations https://w3id.org/dpv/risk#BruteForceAuthorisations | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | BSI-200-2 | Prefix | risk-owl |
---|---|---|---|
Label | BSI Standard 200-2 | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#BSI-200-2 https://w3id.org/dpv/risk#BSI-200-2 | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | The BSI-Standard 200-2 (‘IT-Grundschutz Methodology’) provides a methodology for the management of information security which can be adapted to the requirements of organisations of various types and sizes | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | Businessdisruption | Prefix | risk-owl |
---|---|---|---|
Label | Business disruption | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#Businessdisruption https://w3id.org/dpv/risk#Businessdisruption | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | BusinessImpact | Prefix | risk-owl |
---|---|---|---|
Label | Business impact | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#BusinessImpact https://w3id.org/dpv/risk#BusinessImpact | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Methodology for Sectoral Cybersecurity Assessments | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | BusinessPerformanceImpairment | Prefix | risk-owl |
---|---|---|---|
Label | Business Performance Impairment | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#BusinessPerformanceImpairment https://w3id.org/dpv/risk#BusinessPerformanceImpairment | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | CausalMapping | Prefix | risk-owl |
---|---|---|---|
Label | Causal Mapping | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#CausalMapping https://w3id.org/dpv/risk#CausalMapping | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QualitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | A network diagram representing events, causes and effects and their relationships. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | CauseConsequenceAnalysis | Prefix | risk-owl |
---|---|---|---|
Label | Cause-Consequence Analysis | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#CauseConsequenceAnalysis https://w3id.org/dpv/risk#CauseConsequenceAnalysis | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QuantitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | A combination of fault and event tree analysis that allows inclusion of time delays. Both causes and consequences of an initiating event are considered. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | CCRACII | Prefix | risk-owl |
---|---|---|---|
Label | CCRACII | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#CCRACII https://w3id.org/dpv/risk#CCRACII | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | The Guide to Conducting Cybersecurity Risk Assessment for Critical Information Infrastructure (CCRACII) defines commonly used terms such as threat event, vulnerability, likelihood, impact and risk, roles, and responsibilities, in addition to a range for risk levels, ranging from low to very high with different level of risk toleranc | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | ChangeConsequence | Prefix | risk-owl |
---|---|---|---|
Label | Change Consequence | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ChangeConsequence https://w3id.org/dpv/risk#ChangeConsequence | ||
Type | rdfs:Class , owl:Class , dpv-owl:RiskMitigationMeasure | ||
Sub-class of | risk-owl:ControlConsequence → dpv-owl:RiskMitigationMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Domain of | dpv-owl:mitigatesRisk | ||
in Range of | dpv-owl:hasTechnicalOrganisationalMeasure, dpv-owl:isMitigatedByMeasure | ||
Definition | Risk Control that changes Consequence | ||
Date Created | 2022-08-25 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-controls |
Term | ChangeImpact | Prefix | risk-owl |
---|---|---|---|
Label | Change Impact | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ChangeImpact https://w3id.org/dpv/risk#ChangeImpact | ||
Type | rdfs:Class , owl:Class , dpv-owl:RiskMitigationMeasure | ||
Sub-class of | risk-owl:ControlImpact → risk-owl:ControlConsequence → dpv-owl:RiskMitigationMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Domain of | dpv-owl:mitigatesRisk | ||
in Range of | dpv-owl:hasTechnicalOrganisationalMeasure, dpv-owl:isMitigatedByMeasure | ||
Definition | Risk Control that changes Impact | ||
Date Created | 2022-08-26 | ||
Date Modified | 2023-07-31 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-controls |
Term | Checklists | Prefix | risk-owl |
---|---|---|---|
Label | Checklists | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#Checklists https://w3id.org/dpv/risk#Checklists | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QualitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | A checklist based on experience or on concepts and models that can be used to help identify risks or controls. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | ChildViolence | Prefix | risk-owl |
---|---|---|---|
Label | Child Violence | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ChildViolence https://w3id.org/dpv/risk#ChildViolence | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Harm → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | Cindynic | Prefix | risk-owl |
---|---|---|---|
Label | Cindynic Approach | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#Cindynic https://w3id.org/dpv/risk#Cindynic | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QualitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | Considers goals, values, rules, data and models of stakeholders and identifies inconsistencies, ambiguities, omissions and ignorance. These form systemic sources and drivers of risk. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | CitizensImpact | Prefix | risk-owl |
---|---|---|---|
Label | Citizens impact | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#CitizensImpact https://w3id.org/dpv/risk#CitizensImpact | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Methodology for Sectoral Cybersecurity Assessments | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | Classifications | Prefix | risk-owl |
---|---|---|---|
Label | Classifications | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#Classifications https://w3id.org/dpv/risk#Classifications | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QualitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | A classification list based on experience or on concepts and models that can be used to help identify risks or controls. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | Coercion | Prefix | risk-owl |
---|---|---|---|
Label | Coercion | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#Coercion https://w3id.org/dpv/risk#Coercion | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Harm → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Threat Taxonomy 2016 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | ComplianceImpact | Prefix | risk-owl |
---|---|---|---|
Label | Compliance impact | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ComplianceImpact https://w3id.org/dpv/risk#ComplianceImpact | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Methodology for Sectoral Cybersecurity Assessments | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | CompromiseAccount | Prefix | risk-owl |
---|---|---|---|
Label | Compromise Account | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#CompromiseAccount https://w3id.org/dpv/risk#CompromiseAccount | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Harm → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | CompromiseAccountCredentials | Prefix | risk-owl |
---|---|---|---|
Label | Compromise Account Credentials | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#CompromiseAccountCredentials https://w3id.org/dpv/risk#CompromiseAccountCredentials | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Harm → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | CompromiseAccountSecurity | Prefix | risk-owl |
---|---|---|---|
Label | Compromise Account Security | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#CompromiseAccountSecurity https://w3id.org/dpv/risk#CompromiseAccountSecurity | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:NonMaterialDamage → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | ConfidentialityBreach | Prefix | risk-owl |
---|---|---|---|
Label | Confidentiality Breach | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ConfidentialityBreach https://w3id.org/dpv/risk#ConfidentialityBreach | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | ConsequenceForDataSubject | Prefix | risk-owl |
---|---|---|---|
Label | Consequence for Data Subject | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ConsequenceForDataSubject https://w3id.org/dpv/risk#ConsequenceForDataSubject | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence | ||
Date Created | 2022-10-22 | ||
Contributors | Harshvardhan J. Pandit, Georg P. Krog | ||
Documented in | Risk Risk-consequences |
Term | ConsequenceOnDataSecurity | Prefix | risk-owl |
---|---|---|---|
Label | Consequence on Data Security | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ConsequenceOnDataSecurity https://w3id.org/dpv/risk#ConsequenceOnDataSecurity | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence | ||
Date Created | 2022-10-22 | ||
Contributors | Harshvardhan J. Pandit, Georg P. Krog | ||
Documented in | Risk Risk-consequences |
Term | ControlConsequence | Prefix | risk-owl |
---|---|---|---|
Label | Control Consequence | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ControlConsequence https://w3id.org/dpv/risk#ControlConsequence | ||
Type | rdfs:Class , owl:Class , dpv-owl:RiskMitigationMeasure | ||
Sub-class of | dpv-owl:RiskMitigationMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Domain of | dpv-owl:mitigatesRisk | ||
in Range of | dpv-owl:hasTechnicalOrganisationalMeasure, dpv-owl:isMitigatedByMeasure | ||
Definition | Risk Mitigation Measure that controls the Consequences | ||
Date Created | 2022-08-24 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-controls |
Term | ControlImpact | Prefix | risk-owl |
---|---|---|---|
Label | Control Impact | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ControlImpact https://w3id.org/dpv/risk#ControlImpact | ||
Type | rdfs:Class , owl:Class , dpv-owl:RiskMitigationMeasure | ||
Sub-class of | risk-owl:ControlConsequence → dpv-owl:RiskMitigationMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Domain of | dpv-owl:mitigatesRisk | ||
in Range of | dpv-owl:hasTechnicalOrganisationalMeasure, dpv-owl:isMitigatedByMeasure | ||
Definition | Risk Mitigation Measure that controls Impacts | ||
Date Created | 2022-08-24 | ||
Date Modified | 2023-07-31 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-controls |
Term | ControlMonitors | Prefix | risk-owl |
---|---|---|---|
Label | Control Monitors | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ControlMonitors https://w3id.org/dpv/risk#ControlMonitors | ||
Type | rdfs:Class , owl:Class , dpv-owl:RiskMitigationMeasure | ||
Sub-class of | dpv-owl:RiskMitigationMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Domain of | dpv-owl:mitigatesRisk | ||
in Range of | dpv-owl:hasTechnicalOrganisationalMeasure, dpv-owl:isMitigatedByMeasure | ||
Definition | Risk Mitigation Measure that uses controls to monitor events | ||
Usage Note | Monitoring can be associated with characteristics such as assessing or detecting whether something is active, operational, performant, effective, has potential to materialise, is materialising, or has already materialised. | ||
Date Created | 2022-08-30 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-controls |
Term | ControlRiskSource | Prefix | risk-owl |
---|---|---|---|
Label | Control Risk Source | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ControlRiskSource https://w3id.org/dpv/risk#ControlRiskSource | ||
Type | rdfs:Class , owl:Class , dpv-owl:RiskMitigationMeasure | ||
Sub-class of | dpv-owl:RiskMitigationMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Domain of | dpv-owl:mitigatesRisk | ||
in Range of | dpv-owl:hasTechnicalOrganisationalMeasure, dpv-owl:isMitigatedByMeasure | ||
Definition | Risk Mitigation Measure that controls the Risk Source | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-controls |
Term | CopyrightViolation | Prefix | risk-owl |
---|---|---|---|
Label | Copyright Violation | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#CopyrightViolation https://w3id.org/dpv/risk#CopyrightViolation | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:NonMaterialDamage → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | CORAS | Prefix | risk-owl |
---|---|---|---|
Label | CORAS | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#CORAS https://w3id.org/dpv/risk#CORAS | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | The CORAS method was developed and is supported by SourceForge. It is a method for conducting the analysis and management of security risk. It provides a customised language for modelling threats and risks as well as detailed guidelines explaining how the language should be used to capture and model relevant information during the various stages of the security analysis | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | CorruptionData | Prefix | risk-owl |
---|---|---|---|
Label | Corruption of Data | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#CorruptionData https://w3id.org/dpv/risk#CorruptionData | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | CostAcquisition | Prefix | risk-owl |
---|---|---|---|
Label | Cost of Acquisition | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#CostAcquisition https://w3id.org/dpv/risk#CostAcquisition | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | CostBackup | Prefix | risk-owl |
---|---|---|---|
Label | Cost of Backup | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#CostBackup https://w3id.org/dpv/risk#CostBackup | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | CostBenefitAnalysis | Prefix | risk-owl |
---|---|---|---|
Label | Cost/benefit Analysis | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#CostBenefitAnalysis https://w3id.org/dpv/risk#CostBenefitAnalysis | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QuantitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | Uses money as a scale for estimating positive and negative, tangible and intangible, consequences of different options. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | CostConfiguration | Prefix | risk-owl |
---|---|---|---|
Label | Cost of Configuration | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#CostConfiguration https://w3id.org/dpv/risk#CostConfiguration | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | CostInstallation | Prefix | risk-owl |
---|---|---|---|
Label | Cost of Installation | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#CostInstallation https://w3id.org/dpv/risk#CostInstallation | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | CostJudicialPenalties | Prefix | risk-owl |
---|---|---|---|
Label | Cost of Judicial Penalties | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#CostJudicialPenalties https://w3id.org/dpv/risk#CostJudicialPenalties | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | CostJudicialProceedings | Prefix | risk-owl |
---|---|---|---|
Label | Cost of Judicial Proceedings | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#CostJudicialProceedings https://w3id.org/dpv/risk#CostJudicialProceedings | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | CostOperationInterruption | Prefix | risk-owl |
---|---|---|---|
Label | Cost of Operation Interruption | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#CostOperationInterruption https://w3id.org/dpv/risk#CostOperationInterruption | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | CostSuspendedOperations | Prefix | risk-owl |
---|---|---|---|
Label | Cost of Suspended Operations | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#CostSuspendedOperations https://w3id.org/dpv/risk#CostSuspendedOperations | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | CRAMM | Prefix | risk-owl |
---|---|---|---|
Label | CRAMM | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#CRAMM https://w3id.org/dpv/risk#CRAMM | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | CCTA Risk Assessment and Management Methodology (CRAMM) is a method that an analyst or group of analysts may use to evaluate the security and risk level of an organisation by analysing and combining the diverse knowledge distributed in the local corporate environment | ||
Source | ENISA Risk Management Standards | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | CrossImpactAnalysis | Prefix | risk-owl |
---|---|---|---|
Label | Cross Impact Analysis | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#CrossImpactAnalysis https://w3id.org/dpv/risk#CrossImpactAnalysis | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QuantitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | Evaluates changes in the probability of the occurrence of a given set of events consequent on the actual occurrence of one of them. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | Cryptojacking | Prefix | risk-owl |
---|---|---|---|
Label | Cryptojacking | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#Cryptojacking https://w3id.org/dpv/risk#Cryptojacking | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Definition | Cryptojacking or hidden cryptomining is a type of cybercrime where a criminal secretly uses a victim’s computing power to generate cryptocurrency | ||
Source | ENISA Threat Landscape 2021 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | CVaR | Prefix | risk-owl |
---|---|---|---|
Label | Conditional Value at Risk (CVaR) | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#CVaR https://w3id.org/dpv/risk#CVaR | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QuantitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | A measure of the expected loss from a financial portfolio in the worst a % of cases. Also called expected shortfall (ES) | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | CyberSpying | Prefix | risk-owl |
---|---|---|---|
Label | Cyber Spying | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#CyberSpying https://w3id.org/dpv/risk#CyberSpying | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:NonMaterialDamage → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | CyberStalking | Prefix | risk-owl |
---|---|---|---|
Label | Cyber Stalking | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#CyberStalking https://w3id.org/dpv/risk#CyberStalking | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:NonMaterialDamage → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | DamageByThirdParty | Prefix | risk-owl |
---|---|---|---|
Label | Damage by Third Party | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#DamageByThirdParty https://w3id.org/dpv/risk#DamageByThirdParty | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Threat Taxonomy 2016 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | DangertoCustomers | Prefix | risk-owl |
---|---|---|---|
Label | Danger to Customers | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#DangertoCustomers https://w3id.org/dpv/risk#DangertoCustomers | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Harm → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | DangertoPersonnel | Prefix | risk-owl |
---|---|---|---|
Label | Danger to Personnel | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#DangertoPersonnel https://w3id.org/dpv/risk#DangertoPersonnel | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Harm → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | DataBreach | Prefix | risk-owl |
---|---|---|---|
Label | Data Breach | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#DataBreach https://w3id.org/dpv/risk#DataBreach | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | DecisionTreeAnalysis | Prefix | risk-owl |
---|---|---|---|
Label | Decision Tree Analysis | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#DecisionTreeAnalysis https://w3id.org/dpv/risk#DecisionTreeAnalysis | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QuantitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | Uses a tree-like representation or model of decisions and their possible consequences. Outcomes are usually expressed in monetary terms or in terms of utility. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | DelphiTechnique | Prefix | risk-owl |
---|---|---|---|
Label | Delphi Technique | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#DelphiTechnique https://w3id.org/dpv/risk#DelphiTechnique | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QualitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | Collects judgements through a set of sequential questionnaires. People participate individually but receive feedback on the responses of others after each set of questions. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | DenialServiceAttack | Prefix | risk-owl |
---|---|---|---|
Label | Denial of Service Attack (DoS) | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#DenialServiceAttack https://w3id.org/dpv/risk#DenialServiceAttack | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | DetrimentToRecovery | Prefix | risk-owl |
---|---|---|---|
Label | Detriment to Recovery | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#DetrimentToRecovery https://w3id.org/dpv/risk#DetrimentToRecovery | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Threat Taxonomy 2016 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | Discrimination | Prefix | risk-owl |
---|---|---|---|
Label | Discrimination | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#Discrimination https://w3id.org/dpv/risk#Discrimination | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Harm → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Date Created | 2022-08-19 | ||
Contributors | Georg P. Krog | ||
Documented in | Risk Risk-consequences |
Term | DistributedDenialServiceAttack | Prefix | risk-owl |
---|---|---|---|
Label | Distributed Denial of Service Attack (DDoS) | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#DistributedDenialServiceAttack https://w3id.org/dpv/risk#DistributedDenialServiceAttack | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | DPIA | Prefix | risk-owl |
---|---|---|---|
Label | Data Protection Impact Assessment (DPIA) | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#DPIA https://w3id.org/dpv/risk#DPIA | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QualitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | Analyses how incidents and events could affect the protection of data and its effects on persons and identifies and quantifies the capabilities that would be needed to manage it. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | Eavesdropping | Prefix | risk-owl |
---|---|---|---|
Label | Eavesdropping | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#Eavesdropping https://w3id.org/dpv/risk#Eavesdropping | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:NonMaterialDamage → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | EBIOS | Prefix | risk-owl |
---|---|---|---|
Label | EBIOS | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#EBIOS https://w3id.org/dpv/risk#EBIOS | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | Expression des Besoins et Identification des Objectifs de Sécurité (EBIOS) Risk Manager is an information security risk management method, created under the French General Secretariat of National Defence, consistent with ISO 31000 and ISO/IEC 27005, and enables the risk management requirements of ISO/IEC 27001 to be met | ||
Source | ENISA Risk Management Standards | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | EconomicDisadvantage | Prefix | risk-owl |
---|---|---|---|
Label | Economic Disadvantage | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#EconomicDisadvantage https://w3id.org/dpv/risk#EconomicDisadvantage | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Date Created | 2022-08-19 | ||
Contributors | Georg P. Krog | ||
Documented in | Risk Risk-consequences |
Term | EnvironmentalSafetyEndangerment | Prefix | risk-owl |
---|---|---|---|
Label | Environmental Safety Endangerment | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#EnvironmentalSafetyEndangerment https://w3id.org/dpv/risk#EnvironmentalSafetyEndangerment | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Harm → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | EquipmentFailure | Prefix | risk-owl |
---|---|---|---|
Label | Equipment Failure | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#EquipmentFailure https://w3id.org/dpv/risk#EquipmentFailure | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | EquipmentMalfunction | Prefix | risk-owl |
---|---|---|---|
Label | Equipment Malfunction | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#EquipmentMalfunction https://w3id.org/dpv/risk#EquipmentMalfunction | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | ERM-IF | Prefix | risk-owl |
---|---|---|---|
Label | ERM-IF | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ERM-IF https://w3id.org/dpv/risk#ERM-IF | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | Enterprise Risk Management - Integrated Framework (ERM-IF) defines the essential components of enterprise risk management. It is based on a set of principles and concepts for the enterprise and has as its objective to offer a common language for enterprise risk | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | ErrornousSystemUse | Prefix | risk-owl |
---|---|---|---|
Label | Errornous System Use | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ErrornousSystemUse https://w3id.org/dpv/risk#ErrornousSystemUse | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | ETSI-TS-102-165-1 | Prefix | risk-owl |
---|---|---|---|
Label | ETSI TS 102 165-1 | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ETSI-TS-102-165-1 https://w3id.org/dpv/risk#ETSI-TS-102-165-1 | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | ETSI TS 102 165-1 offers methodology and pro-forma for threat, vulnerability and risk analysis (TVRA). According to ETSI TS 102 165-1, threat vulnerability and risk analysis (TVRA) is used to identify risk to an information system based upon the product of the likelihood of an attack and the impact that such an attack will have on the system | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | EU-ITSRM | Prefix | risk-owl |
---|---|---|---|
Label | ITSRM² | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#EU-ITSRM https://w3id.org/dpv/risk#EU-ITSRM | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | ITSRM² IT Security Risk Management Methodology is a methodology provided by DG DIGIT and the European Commission as part of a set of standards for information security | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | Extorsion | Prefix | risk-owl |
---|---|---|---|
Label | Extorsion | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#Extorsion https://w3id.org/dpv/risk#Extorsion | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Harm → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Threat Taxonomy 2016 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | ExtremelyHighLikelihood | Prefix | risk-owl |
---|---|---|---|
Label | Extremely High Likelihood | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ExtremelyHighLikelihood https://w3id.org/dpv/risk#ExtremelyHighLikelihood | ||
Type | rdfs:Class , owl:Class , dpv-owl:Likelihood | ||
Sub-class of | risk-owl:7LikelihoodLevels → dpv-owl:Likelihood | ||
in Range of | dpv-owl:hasLikelihood | ||
Definition | Level where Likelihood is Extremely High | ||
Usage Note | The suggested quantitative value for this concept is 0.99 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-levels |
Term | ExtremelyHighRisk | Prefix | risk-owl |
---|---|---|---|
Label | Extremely High Risk | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ExtremelyHighRisk https://w3id.org/dpv/risk#ExtremelyHighRisk | ||
Type | rdfs:Class , owl:Class , dpv-owl:RiskLevel | ||
Sub-class of | risk-owl:7RiskLevels → dpv-owl:RiskLevel | ||
in Range of | dpv-owl:hasRiskLevel | ||
Definition | Level where Risk is Extremely High | ||
Usage Note | The suggested quantitative value for this concept is 0.99 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-levels |
Term | ExtremelyHighSeverity | Prefix | risk-owl |
---|---|---|---|
Label | Extremely High Severity | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ExtremelyHighSeverity https://w3id.org/dpv/risk#ExtremelyHighSeverity | ||
Type | rdfs:Class , owl:Class , dpv-owl:Severity | ||
Sub-class of | risk-owl:7SeverityLevels → dpv-owl:Severity | ||
in Range of | dpv-owl:hasSeverity | ||
Definition | Level where Severity is Extremely High | ||
Usage Note | The suggested quantitative value for this concept is 0.99 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-levels |
Term | ExtremelyLowLikelihood | Prefix | risk-owl |
---|---|---|---|
Label | Extremely Low Likelihood | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ExtremelyLowLikelihood https://w3id.org/dpv/risk#ExtremelyLowLikelihood | ||
Type | rdfs:Class , owl:Class , dpv-owl:Likelihood | ||
Sub-class of | risk-owl:7LikelihoodLevels → dpv-owl:Likelihood | ||
in Range of | dpv-owl:hasLikelihood | ||
Definition | Level where Likelihood is Extremely Low | ||
Usage Note | The suggested quantitative value for this concept is 0.01 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-levels |
Term | ExtremelyLowRisk | Prefix | risk-owl |
---|---|---|---|
Label | Extremely Low Risk | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ExtremelyLowRisk https://w3id.org/dpv/risk#ExtremelyLowRisk | ||
Type | rdfs:Class , owl:Class , dpv-owl:RiskLevel | ||
Sub-class of | risk-owl:7RiskLevels → dpv-owl:RiskLevel | ||
in Range of | dpv-owl:hasRiskLevel | ||
Definition | Level where Risk is Extremely Low | ||
Usage Note | The suggested quantitative value for this concept is 0.01 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-levels |
Term | ExtremelyLowSeverity | Prefix | risk-owl |
---|---|---|---|
Label | Extremely Low Severity | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ExtremelyLowSeverity https://w3id.org/dpv/risk#ExtremelyLowSeverity | ||
Type | rdfs:Class , owl:Class , dpv-owl:Severity | ||
Sub-class of | risk-owl:7SeverityLevels → dpv-owl:Severity | ||
in Range of | dpv-owl:hasSeverity | ||
Definition | Level where Severity is Extremely Low | ||
Usage Note | The suggested quantitative value for this concept is 0.01 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-levels |
Term | FAIR | Prefix | risk-owl |
---|---|---|---|
Label | FAIR | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#FAIR https://w3id.org/dpv/risk#FAIR | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | The purpose of the FAIR (Factor Analysis of Information Risk) model is to help organisations understand, analyse, and measure information risk. The model provides an approach to quantify risk and defines the necessary building blocks for implementing effective cyber risk management programmes | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | FAIR-Privacy | Prefix | risk-owl |
---|---|---|---|
Label | FAIR Privacy | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#FAIR-Privacy https://w3id.org/dpv/risk#FAIR-Privacy | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | Factors Analysis in Information Risk (FAIR Privacy) is a quantitative privacy risk framework based on FAIR (Factors Analysis in Information Risk) that examines personal privacy risks (to individuals), not organisational risks | ||
Source | ENISA Risk Management Standards | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | FinancialEquipmentCosts | Prefix | risk-owl |
---|---|---|---|
Label | Financial Equipment Costs | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#FinancialEquipmentCosts https://w3id.org/dpv/risk#FinancialEquipmentCosts | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | FinancialInvestigationCosts | Prefix | risk-owl |
---|---|---|---|
Label | Financial Investigation Costs | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#FinancialInvestigationCosts https://w3id.org/dpv/risk#FinancialInvestigationCosts | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | FinancialLoss | Prefix | risk-owl |
---|---|---|---|
Label | Financial Loss | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#FinancialLoss https://w3id.org/dpv/risk#FinancialLoss | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | FinancialPersonnelCosts | Prefix | risk-owl |
---|---|---|---|
Label | Financial Personnel Costs | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#FinancialPersonnelCosts https://w3id.org/dpv/risk#FinancialPersonnelCosts | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | FinancialRepairCosts | Prefix | risk-owl |
---|---|---|---|
Label | Financial Repair Costs | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#FinancialRepairCosts https://w3id.org/dpv/risk#FinancialRepairCosts | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | Fishbone | Prefix | risk-owl |
---|---|---|---|
Label | Ishikawa (Fishbone) | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#Fishbone https://w3id.org/dpv/risk#Fishbone | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QualitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | Identifies contributory factors to a defined outcome (wanted or unwanted). Contributory factors are usually divided into predefined categories and displayed in a tree structure or a fishbone diagram. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | FMEA | Prefix | risk-owl |
---|---|---|---|
Label | Failure Modes And Effects Analysis (FMEA) | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#FMEA https://w3id.org/dpv/risk#FMEA | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QualitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
Sub-class of | risk-owl:QuantitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | Considers the ways in which each component of a system might fail and the failure causes and effects. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | FNDiagrams | Prefix | risk-owl |
---|---|---|---|
Label | F-N Diagrams | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#FNDiagrams https://w3id.org/dpv/risk#FNDiagrams | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QuantitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | Special case of quantitative consequence/likelihood graph applied to consideration of tolerability of risk to human life. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | Fraud | Prefix | risk-owl |
---|---|---|---|
Label | Fraud | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#Fraud https://w3id.org/dpv/risk#Fraud | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Harm → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | GameTheory | Prefix | risk-owl |
---|---|---|---|
Label | Game Theory | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#GameTheory https://w3id.org/dpv/risk#GameTheory | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QuantitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | The study of strategic decision making to model the impact of the decisions of different players involved in the game. Example application area can be risk based pricing. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | GCSOS | Prefix | risk-owl |
---|---|---|---|
Label | GCSOS | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#GCSOS https://w3id.org/dpv/risk#GCSOS | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | The Guidelines on Cyber Security Onboard Ships (GCSOS) guidelines explain why and how cyber risks should be managed in a shipping context. They outline the risk assessment process with an explanation of the part played by each component of cyber risk and offer advice on how to respond to and recover from cyber incidents | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | GovernmentCrisis | Prefix | risk-owl |
---|---|---|---|
Label | Government Crisis | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#GovernmentCrisis https://w3id.org/dpv/risk#GovernmentCrisis | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | HACCP | Prefix | risk-owl |
---|---|---|---|
Label | Hazard Analysis And Critical Control Points (HACCP) | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#HACCP https://w3id.org/dpv/risk#HACCP | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QualitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | Analyses the risk reduction that can be achieved by various layers of protection. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | HaltSource | Prefix | risk-owl |
---|---|---|---|
Label | Halt Source | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#HaltSource https://w3id.org/dpv/risk#HaltSource | ||
Type | rdfs:Class , owl:Class , dpv-owl:RiskMitigationMeasure | ||
Sub-class of | risk-owl:ControlRiskSource → dpv-owl:RiskMitigationMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Domain of | dpv-owl:mitigatesRisk | ||
in Range of | dpv-owl:hasTechnicalOrganisationalMeasure, dpv-owl:isMitigatedByMeasure | ||
Definition | Risk Control that halts the risk source or prevents it from materialising | ||
Date Created | 2022-08-19 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-controls |
Term | HarmfulSpeech | Prefix | risk-owl |
---|---|---|---|
Label | Harmful Spech | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#HarmfulSpeech https://w3id.org/dpv/risk#HarmfulSpeech | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Harm → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | HAZOP | Prefix | risk-owl |
---|---|---|---|
Label | Hazard And Operability Studies (HAZOP) | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#HAZOP https://w3id.org/dpv/risk#HAZOP | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QualitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | A structured and systematic examination of a planned or existing process or operation in order to identify and evaluate problems that might represent risk to personnel or equipment, or prevent efficient operation | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | HealthLifeImpact | Prefix | risk-owl |
---|---|---|---|
Label | Health and life impact | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#HealthLifeImpact https://w3id.org/dpv/risk#HealthLifeImpact | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Methodology for Sectoral Cybersecurity Assessments | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | HighLikelihood | Prefix | risk-owl |
---|---|---|---|
Label | High Likelihood | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#HighLikelihood https://w3id.org/dpv/risk#HighLikelihood | ||
Type | rdfs:Class , owl:Class , dpv-owl:Likelihood | ||
Sub-class of | risk-owl:3LikelihoodLevels → dpv-owl:Likelihood | ||
Sub-class of | risk-owl:5LikelihoodLevels → dpv-owl:Likelihood | ||
Sub-class of | risk-owl:7LikelihoodLevels → dpv-owl:Likelihood | ||
in Range of | dpv-owl:hasLikelihood | ||
Definition | Level where Likelihood is High | ||
Usage Note | The suggested quantitative value for this concept is 0.75 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-levels |
Term | HighRisk | Prefix | risk-owl |
---|---|---|---|
Label | High Risk | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#HighRisk https://w3id.org/dpv/risk#HighRisk | ||
Type | rdfs:Class , owl:Class , dpv-owl:RiskLevel | ||
Sub-class of | risk-owl:3RiskLevels → dpv-owl:RiskLevel | ||
Sub-class of | risk-owl:5RiskLevels → dpv-owl:RiskLevel | ||
Sub-class of | risk-owl:7RiskLevels → dpv-owl:RiskLevel | ||
in Range of | dpv-owl:hasRiskLevel | ||
Definition | Level where Risk is High | ||
Usage Note | The suggested quantitative value for this concept is 0.75 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-levels |
Term | HighSeverity | Prefix | risk-owl |
---|---|---|---|
Label | High Severity | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#HighSeverity https://w3id.org/dpv/risk#HighSeverity | ||
Type | rdfs:Class , owl:Class , dpv-owl:Severity | ||
Sub-class of | risk-owl:3SeverityLevels → dpv-owl:Severity | ||
Sub-class of | risk-owl:5SeverityLevels → dpv-owl:Severity | ||
Sub-class of | risk-owl:7SeverityLevels → dpv-owl:Severity | ||
in Range of | dpv-owl:hasSeverity | ||
Definition | Level where Severity is High | ||
Usage Note | The suggested quantitative value for this concept is 0.75 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-levels |
Term | HITRUST-CSF | Prefix | risk-owl |
---|---|---|---|
Label | HITRUST-CSF | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#HITRUST-CSF https://w3id.org/dpv/risk#HITRUST-CSF | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | The HITRUST Cyber-Security Framework (CSF) is a framework created by security industry experts to safeguard sensitive information and manage information risk for organisations across all industries and throughout the third-party supply chain | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | HumanErrors | Prefix | risk-owl |
---|---|---|---|
Label | Human Errors | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#HumanErrors https://w3id.org/dpv/risk#HumanErrors | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | IdentityDispute | Prefix | risk-owl |
---|---|---|---|
Label | Identity Dispute | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#IdentityDispute https://w3id.org/dpv/risk#IdentityDispute | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Date Created | 2022-08-24 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | IdentityFraud | Prefix | risk-owl |
---|---|---|---|
Label | Identity Fraud | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#IdentityFraud https://w3id.org/dpv/risk#IdentityFraud | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Harm → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Threat Taxonomy 2016 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | IdentityTheft | Prefix | risk-owl |
---|---|---|---|
Label | Identity Theft | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#IdentityTheft https://w3id.org/dpv/risk#IdentityTheft | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Harm → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Threat Taxonomy 2016 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | IllegalProcessingData | Prefix | risk-owl |
---|---|---|---|
Label | Illegal Processing of Data | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#IllegalProcessingData https://w3id.org/dpv/risk#IllegalProcessingData | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | IMO-MSC-FAL1-CIRC3 | Prefix | risk-owl |
---|---|---|---|
Label | IMO MSC-FAL.1/CIRC.3 | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#IMO-MSC-FAL1-CIRC3 https://w3id.org/dpv/risk#IMO-MSC-FAL1-CIRC3 | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | The official International Maritime Organization guidelines IMO MSC-FAL.1/CIRC.3 provide a high-level approach to the management pf maritime cyber risk which refers to the extent a technology asset is exposed to risks during an event that could result in shipping-related operational failure | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | ImpactOnDataSubject | Prefix | risk-owl |
---|---|---|---|
Label | Impact on Data Subject | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ImpactOnDataSubject https://w3id.org/dpv/risk#ImpactOnDataSubject | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Date Created | 2022-10-22 | ||
Contributors | Harshvardhan J. Pandit, Georg P. Krog | ||
Documented in | Risk Risk-consequences |
Term | ImpacttoRights | Prefix | risk-owl |
---|---|---|---|
Label | Impact to Rights | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ImpacttoRights https://w3id.org/dpv/risk#ImpacttoRights | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | IncreaseInternalCost | Prefix | risk-owl |
---|---|---|---|
Label | Increase Internal Cost | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#IncreaseInternalCost https://w3id.org/dpv/risk#IncreaseInternalCost | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | IndustrialCrisis | Prefix | risk-owl |
---|---|---|---|
Label | Industrial Crisis | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#IndustrialCrisis https://w3id.org/dpv/risk#IndustrialCrisis | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | InfluenceDiagrams | Prefix | risk-owl |
---|---|---|---|
Label | Influence Diagrams | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#InfluenceDiagrams https://w3id.org/dpv/risk#InfluenceDiagrams | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QuantitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | An extended version of Bayesian networks that includes variables representing uncertainties, consequences and actions | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | Injury | Prefix | risk-owl |
---|---|---|---|
Label | Injury | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#Injury https://w3id.org/dpv/risk#Injury | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Harm → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | InterceptionCommunications | Prefix | risk-owl |
---|---|---|---|
Label | Interception of Communications | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#InterceptionCommunications https://w3id.org/dpv/risk#InterceptionCommunications | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | InternalOperationDisruption | Prefix | risk-owl |
---|---|---|---|
Label | Internal Operation Disruption | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#InternalOperationDisruption https://w3id.org/dpv/risk#InternalOperationDisruption | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | Interviews | Prefix | risk-owl |
---|---|---|---|
Label | Interviews | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#Interviews https://w3id.org/dpv/risk#Interviews | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QualitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | Structured or semi- structured one-to-one conversations to elicit views. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | IRAM2 | Prefix | risk-owl |
---|---|---|---|
Label | IRAM2 | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#IRAM2 https://w3id.org/dpv/risk#IRAM2 | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | Information Risk Assessment Methodology (IRAM2) supports risk assessment and treatment and entails a six-phase process, and is is implemented by an automated toolset | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | IS-BM | Prefix | risk-owl |
---|---|---|---|
Label | IS-BM | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#IS-BM https://w3id.org/dpv/risk#IS-BM | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | The IS risk analysis method is based on a business model using a quantitative approach. The values of IS assets come from their importance towards operational continuity, as well as from their replacement costs | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | ISACA-RISK-IT | Prefix | risk-owl |
---|---|---|---|
Label | ISACA-RISK-IT | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ISACA-RISK-IT https://w3id.org/dpv/risk#ISACA-RISK-IT | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | The ISACA Risk IT Framework provides a set of guiding principles and supporting practices for enterprise management, combined to deliver a comprehensive process model for governing and managing IT risk | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | ISAMM | Prefix | risk-owl |
---|---|---|---|
Label | ISAMM | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ISAMM https://w3id.org/dpv/risk#ISAMM | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | Information Security Assessment and Monitoring Method (ISAMM) is a quantitative type of risk management methodology that can be applied by various organisations such as governmental agencies, large companies and small and medium size enterprises | ||
Source | ENISA Risk Management Standards | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | ISO-IEC-27005-2018 | Prefix | risk-owl |
---|---|---|---|
Label | ISO/IEC 27005:2018 | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ISO-IEC-27005-2018 https://w3id.org/dpv/risk#ISO-IEC-27005-2018 | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | ISO/IEC 27005:2018 ‘Information technology — Security techniques — Information security risk management’ is a risk management framework applicable to all types of organisations (e.g. commercial enterprises, government agencies, non-profit organisations) which intend to manage risks that could compromise the organisation’s information security | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | ISRAM | Prefix | risk-owl |
---|---|---|---|
Label | ISRAM | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ISRAM https://w3id.org/dpv/risk#ISRAM | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | ISRAM is a quantitative, paper-based risk analysis method that is designed to allow effective participation of managers and staff in the process | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | IT-Grundschutz | Prefix | risk-owl |
---|---|---|---|
Label | IT-Grundschutz | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#IT-Grundschutz https://w3id.org/dpv/risk#IT-Grundschutz | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | IT-Grundschutz has been developed by the Federal Office for Information Security in Germany. IT-Grundschutz provides a configuration for the establishment of an integrated and effective IT security managemen | ||
Source | ENISA Risk Management Standards | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | KnownVulnerabilityExploited | Prefix | risk-owl |
---|---|---|---|
Label | Known Vulnerability Exploited | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#KnownVulnerabilityExploited https://w3id.org/dpv/risk#KnownVulnerabilityExploited | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | LawEnforcementAdverseEffects | Prefix | risk-owl |
---|---|---|---|
Label | Law Enforcement Adverse Effects | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#LawEnforcementAdverseEffects https://w3id.org/dpv/risk#LawEnforcementAdverseEffects | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | LimitationOfRights | Prefix | risk-owl |
---|---|---|---|
Label | Limitation of Rights | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#LimitationOfRights https://w3id.org/dpv/risk#LimitationOfRights | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Harm → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Date Created | 2022-08-18 | ||
Contributors | Georg P. Krog, Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | LOPA | Prefix | risk-owl |
---|---|---|---|
Label | Layer Protection Analysis (LOPA) | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#LOPA https://w3id.org/dpv/risk#LOPA | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QualitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
Sub-class of | risk-owl:QuantitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | Analyses the risk reduction that can be achieved by various layers of protection. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | LossAssets | Prefix | risk-owl |
---|---|---|---|
Label | Loss of Assets | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#LossAssets https://w3id.org/dpv/risk#LossAssets | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:MaterialDamage → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | LossCompetitiveAdvantage | Prefix | risk-owl |
---|---|---|---|
Label | Loss of Competitive Advantage | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#LossCompetitiveAdvantage https://w3id.org/dpv/risk#LossCompetitiveAdvantage | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:NonMaterialDamage → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | LossControlOverData | Prefix | risk-owl |
---|---|---|---|
Label | Loss of Control over Data | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#LossControlOverData https://w3id.org/dpv/risk#LossControlOverData | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:NonMaterialDamage → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Date Created | 2022-08-19 | ||
Contributors | Georg P. Krog, Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | LossCredibility | Prefix | risk-owl |
---|---|---|---|
Label | Loss of Credibility | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#LossCredibility https://w3id.org/dpv/risk#LossCredibility | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | LossCustomerConfidence | Prefix | risk-owl |
---|---|---|---|
Label | Loss of Customer Confidence | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#LossCustomerConfidence https://w3id.org/dpv/risk#LossCustomerConfidence | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | LossCustomers | Prefix | risk-owl |
---|---|---|---|
Label | Loss of Customers | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#LossCustomers https://w3id.org/dpv/risk#LossCustomers | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:NonMaterialDamage → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | LossData | Prefix | risk-owl |
---|---|---|---|
Label | Loss of Data | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#LossData https://w3id.org/dpv/risk#LossData | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:NonMaterialDamage → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Threat Taxonomy 2016 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | LossFunds | Prefix | risk-owl |
---|---|---|---|
Label | Loss of Funds | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#LossFunds https://w3id.org/dpv/risk#LossFunds | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:MaterialDamage → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | LossGoods | Prefix | risk-owl |
---|---|---|---|
Label | Loss of Goods | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#LossGoods https://w3id.org/dpv/risk#LossGoods | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:MaterialDamage → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | LossGoodwill | Prefix | risk-owl |
---|---|---|---|
Label | Loss of Goodwill | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#LossGoodwill https://w3id.org/dpv/risk#LossGoodwill | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | LossNegotiatingCapacity | Prefix | risk-owl |
---|---|---|---|
Label | Loss of Negotiating Capacity | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#LossNegotiatingCapacity https://w3id.org/dpv/risk#LossNegotiatingCapacity | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | LossOpportunity | Prefix | risk-owl |
---|---|---|---|
Label | Loss of Opportunity | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#LossOpportunity https://w3id.org/dpv/risk#LossOpportunity | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | LossProprietaryInformation | Prefix | risk-owl |
---|---|---|---|
Label | Loss of Proprietary Information | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#LossProprietaryInformation https://w3id.org/dpv/risk#LossProprietaryInformation | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:NonMaterialDamage → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | LossReputation | Prefix | risk-owl |
---|---|---|---|
Label | Loss of Reputation | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#LossReputation https://w3id.org/dpv/risk#LossReputation | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | LossResources | Prefix | risk-owl |
---|---|---|---|
Label | Loss of Resources | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#LossResources https://w3id.org/dpv/risk#LossResources | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:NonMaterialDamage → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Threat Taxonomy 2016 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | LossSuppliers | Prefix | risk-owl |
---|---|---|---|
Label | Loss of Suppliers | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#LossSuppliers https://w3id.org/dpv/risk#LossSuppliers | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:NonMaterialDamage → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | LossTechnologicalAdvantage | Prefix | risk-owl |
---|---|---|---|
Label | Loss of Technological Advantage | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#LossTechnologicalAdvantage https://w3id.org/dpv/risk#LossTechnologicalAdvantage | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:NonMaterialDamage → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | LossTrust | Prefix | risk-owl |
---|---|---|---|
Label | Loss of Trust | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#LossTrust https://w3id.org/dpv/risk#LossTrust | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | LowLikelihood | Prefix | risk-owl |
---|---|---|---|
Label | Low Likelihood | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#LowLikelihood https://w3id.org/dpv/risk#LowLikelihood | ||
Type | rdfs:Class , owl:Class , dpv-owl:Likelihood | ||
Sub-class of | risk-owl:3LikelihoodLevels → dpv-owl:Likelihood | ||
Sub-class of | risk-owl:5LikelihoodLevels → dpv-owl:Likelihood | ||
Sub-class of | risk-owl:7LikelihoodLevels → dpv-owl:Likelihood | ||
in Range of | dpv-owl:hasLikelihood | ||
Definition | Level where Likelihood is Low | ||
Usage Note | The suggested quantitative value for this concept is 0.25 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-levels |
Term | LowRisk | Prefix | risk-owl |
---|---|---|---|
Label | Low Risk | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#LowRisk https://w3id.org/dpv/risk#LowRisk | ||
Type | rdfs:Class , owl:Class , dpv-owl:RiskLevel | ||
Sub-class of | risk-owl:3RiskLevels → dpv-owl:RiskLevel | ||
Sub-class of | risk-owl:5RiskLevels → dpv-owl:RiskLevel | ||
Sub-class of | risk-owl:7RiskLevels → dpv-owl:RiskLevel | ||
in Range of | dpv-owl:hasRiskLevel | ||
Definition | Level where Risk is Low | ||
Usage Note | The suggested quantitative value for this concept is 0.25 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-levels |
Term | LowSeverity | Prefix | risk-owl |
---|---|---|---|
Label | Low Severity | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#LowSeverity https://w3id.org/dpv/risk#LowSeverity | ||
Type | rdfs:Class , owl:Class , dpv-owl:Severity | ||
Sub-class of | risk-owl:3SeverityLevels → dpv-owl:Severity | ||
Sub-class of | risk-owl:5SeverityLevels → dpv-owl:Severity | ||
Sub-class of | risk-owl:7SeverityLevels → dpv-owl:Severity | ||
in Range of | dpv-owl:hasSeverity | ||
Definition | Level where Severity is Low | ||
Usage Note | The suggested quantitative value for this concept is 0.25 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-levels |
Term | MAGERIT | Prefix | risk-owl |
---|---|---|---|
Label | MAGERIT | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#MAGERIT https://w3id.org/dpv/risk#MAGERIT | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | Method for the Harmonised Analysis of Risk (MAGERIT) is an open methodology for risk analysis and management developed by the Spanish Higher Council for Electronic Government and offered as a framework and guide to the public administration | ||
Source | ENISA Risk Management Standards | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | MaliciousCodeAttack | Prefix | risk-owl |
---|---|---|---|
Label | Malicious Code Attack | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#MaliciousCodeAttack https://w3id.org/dpv/risk#MaliciousCodeAttack | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Definition | Intentional use of software by including or inserting in a system for a harmful purpose | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | MalwareAttack | Prefix | risk-owl |
---|---|---|---|
Label | Malware Attack | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#MalwareAttack https://w3id.org/dpv/risk#MalwareAttack | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Definition | Malware is software or firmware intended to perform an unauthorised process that will have an adverse impact on the confidentiality, integrity, or availability of a system | ||
Source | ENISA Methodology for Sectoral Cybersecurity Assessments | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | MarkovAnalysis | Prefix | risk-owl |
---|---|---|---|
Label | Markov Analysis | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#MarkovAnalysis https://w3id.org/dpv/risk#MarkovAnalysis | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QuantitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | Calculates the probability that a system that has the capacity to be in one of a number of states will be in a particular state at a time t in the future. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | MCA | Prefix | risk-owl |
---|---|---|---|
Label | Multi-criteria Analysis (MCA) | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#MCA https://w3id.org/dpv/risk#MCA | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QualitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | Compares options in a way that makes trade-offs explicit. Provides an alternative to cost/benefit analysis that does not need a monetary value to be allocated to all inputs. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | MEHARI | Prefix | risk-owl |
---|---|---|---|
Label | MEHARI | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#MEHARI https://w3id.org/dpv/risk#MEHARI | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | MEHARI is a free of charge qualitative risk analysis and management method developed by CLUSIF (Club for the Security of Information in France/Club de la Sécurité de l'Information Français) | ||
Source | ENISA Risk Management Standards | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | MisinformationDisinformation | Prefix | risk-owl |
---|---|---|---|
Label | MisinformationDisinformation | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#MisinformationDisinformation https://w3id.org/dpv/risk#MisinformationDisinformation | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Definition | Information that is untrue, misleading, or false and used intentionally (disinformation) or unintentionally (misinformation) | ||
Source | ENISA Threat Landscape 2021 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | MisuseBreachedInformation | Prefix | risk-owl |
---|---|---|---|
Label | Misuse of Breached Information | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#MisuseBreachedInformation https://w3id.org/dpv/risk#MisuseBreachedInformation | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | ModerateLikelihood | Prefix | risk-owl |
---|---|---|---|
Label | Moderate Likelihood | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ModerateLikelihood https://w3id.org/dpv/risk#ModerateLikelihood | ||
Type | rdfs:Class , owl:Class , dpv-owl:Likelihood | ||
Sub-class of | risk-owl:3LikelihoodLevels → dpv-owl:Likelihood | ||
Sub-class of | risk-owl:5LikelihoodLevels → dpv-owl:Likelihood | ||
Sub-class of | risk-owl:7LikelihoodLevels → dpv-owl:Likelihood | ||
in Range of | dpv-owl:hasLikelihood | ||
Definition | Level where Likelihood is Moderate | ||
Usage Note | The suggested quantitative value for this concept is 0.5 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-levels |
Term | ModerateRisk | Prefix | risk-owl |
---|---|---|---|
Label | Moderate Risk | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ModerateRisk https://w3id.org/dpv/risk#ModerateRisk | ||
Type | rdfs:Class , owl:Class , dpv-owl:RiskLevel | ||
Sub-class of | risk-owl:3RiskLevels → dpv-owl:RiskLevel | ||
Sub-class of | risk-owl:5RiskLevels → dpv-owl:RiskLevel | ||
Sub-class of | risk-owl:7RiskLevels → dpv-owl:RiskLevel | ||
in Range of | dpv-owl:hasRiskLevel | ||
Definition | Level where Risk is Moderate | ||
Usage Note | The suggested quantitative value for this concept is 0.5 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-levels |
Term | ModerateSeverity | Prefix | risk-owl |
---|---|---|---|
Label | Moderate Severity | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ModerateSeverity https://w3id.org/dpv/risk#ModerateSeverity | ||
Type | rdfs:Class , owl:Class , dpv-owl:Severity | ||
Sub-class of | risk-owl:3SeverityLevels → dpv-owl:Severity | ||
Sub-class of | risk-owl:5SeverityLevels → dpv-owl:Severity | ||
Sub-class of | risk-owl:7SeverityLevels → dpv-owl:Severity | ||
in Range of | dpv-owl:hasSeverity | ||
Definition | Level where Severity is Moderate | ||
Usage Note | The suggested quantitative value for this concept is 0.5 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-levels |
Term | MONARC | Prefix | risk-owl |
---|---|---|---|
Label | MONARC | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#MONARC https://w3id.org/dpv/risk#MONARC | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | MONARC (Méthode Optimisée d’analyse des risques CASES – ‘Method for an Optimised Analysis of Risks by CASES’ is a tool and a method allowing precise and repeatable risk assessments to take place | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | MonitorConsequence | Prefix | risk-owl |
---|---|---|---|
Label | Monitor Consequence | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#MonitorConsequence https://w3id.org/dpv/risk#MonitorConsequence | ||
Type | rdfs:Class , owl:Class , dpv-owl:RiskMitigationMeasure | ||
Sub-class of | risk-owl:ControlMonitors → dpv-owl:RiskMitigationMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Domain of | dpv-owl:mitigatesRisk | ||
in Range of | dpv-owl:hasTechnicalOrganisationalMeasure, dpv-owl:isMitigatedByMeasure | ||
Definition | Risk Control that monitors a Risk Consequence | ||
Date Created | 2022-09-03 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-controls |
Term | MonitorImpact | Prefix | risk-owl |
---|---|---|---|
Label | Monitor Impact | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#MonitorImpact https://w3id.org/dpv/risk#MonitorImpact | ||
Type | rdfs:Class , owl:Class , dpv-owl:RiskMitigationMeasure | ||
Sub-class of | risk-owl:ControlMonitors → dpv-owl:RiskMitigationMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Domain of | dpv-owl:mitigatesRisk | ||
in Range of | dpv-owl:hasTechnicalOrganisationalMeasure, dpv-owl:isMitigatedByMeasure | ||
Definition | Risk Control that monitors a Risk Impact | ||
Date Created | 2022-09-04 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-controls |
Term | MonitorRisk | Prefix | risk-owl |
---|---|---|---|
Label | Monitor Risk | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#MonitorRisk https://w3id.org/dpv/risk#MonitorRisk | ||
Type | rdfs:Class , owl:Class , dpv-owl:RiskMitigationMeasure | ||
Sub-class of | risk-owl:ControlMonitors → dpv-owl:RiskMitigationMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Domain of | dpv-owl:mitigatesRisk | ||
in Range of | dpv-owl:hasTechnicalOrganisationalMeasure, dpv-owl:isMitigatedByMeasure | ||
Definition | Risk Control that monitors a Risk | ||
Date Created | 2022-08-31 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-controls |
Term | MonitorRiskControl | Prefix | risk-owl |
---|---|---|---|
Label | Monitor Risk Control | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#MonitorRiskControl https://w3id.org/dpv/risk#MonitorRiskControl | ||
Type | rdfs:Class , owl:Class , dpv-owl:RiskMitigationMeasure | ||
Sub-class of | risk-owl:ControlMonitors → dpv-owl:RiskMitigationMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Domain of | dpv-owl:mitigatesRisk | ||
in Range of | dpv-owl:hasTechnicalOrganisationalMeasure, dpv-owl:isMitigatedByMeasure | ||
Definition | Risk Control that monitors another Risk Control | ||
Date Created | 2022-09-05 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-controls |
Term | MonitorRiskSource | Prefix | risk-owl |
---|---|---|---|
Label | Monitor Risk Source | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#MonitorRiskSource https://w3id.org/dpv/risk#MonitorRiskSource | ||
Type | rdfs:Class , owl:Class , dpv-owl:RiskMitigationMeasure | ||
Sub-class of | risk-owl:ControlMonitors → dpv-owl:RiskMitigationMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Domain of | dpv-owl:mitigatesRisk | ||
in Range of | dpv-owl:hasTechnicalOrganisationalMeasure, dpv-owl:isMitigatedByMeasure | ||
Definition | Risk Control that monitors a Risk Source | ||
Date Created | 2022-09-01 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-controls |
Term | MonitorVulnerabilities | Prefix | risk-owl |
---|---|---|---|
Label | Monitor Vulnerabilities | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#MonitorVulnerabilities https://w3id.org/dpv/risk#MonitorVulnerabilities | ||
Type | rdfs:Class , owl:Class , dpv-owl:RiskMitigationMeasure | ||
Sub-class of | risk-owl:ControlMonitors → dpv-owl:RiskMitigationMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Domain of | dpv-owl:mitigatesRisk | ||
in Range of | dpv-owl:hasTechnicalOrganisationalMeasure, dpv-owl:isMitigatedByMeasure | ||
Definition | Risk Control that monitors a Risk Vulnerability | ||
Date Created | 2022-09-02 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-controls |
Term | MonteCarloSimulation | Prefix | risk-owl |
---|---|---|---|
Label | Monte Carlo Simulation | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#MonteCarloSimulation https://w3id.org/dpv/risk#MonteCarloSimulation | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QuantitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | Calculates the probability of outcomes by running multiple simulations using random variables. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | NIST-SP-800-30 | Prefix | risk-owl |
---|---|---|---|
Label | NIST SP 800-30 | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#NIST-SP-800-30 https://w3id.org/dpv/risk#NIST-SP-800-30 | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | NIST 800-30 is a free guide that provides a foundation for the development of an effective risk management programme, containing both the definitions and the practical guidance necessary for assessing and mitigating risks identified within IT systems | ||
Source | ENISA Risk Management Standards | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | NIST-SP-800-37 | Prefix | risk-owl |
---|---|---|---|
Label | NIST SP 800-37 | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#NIST-SP-800-37 https://w3id.org/dpv/risk#NIST-SP-800-37 | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | NIST SP 800-37 Rev. 2 is an asset-based RMF which comprises 7 steps, namely Prepare, Categorise, Select, Implement, Assess, Authorise and Monitor. It does not adopt a specific risk assessment methodology, although the NIST 800-30 guide is extensively referenced | ||
Source | ENISA Risk Management Standards | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | NIST-SP-800-39 | Prefix | risk-owl |
---|---|---|---|
Label | NIST SP 800–39 | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#NIST-SP-800-39 https://w3id.org/dpv/risk#NIST-SP-800-39 | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | The purpose of NIST SP 800-39 is to provide a structured, yet flexible approach for an integrated, enterprise-wide programme for managing the risk to information security of organisational operations (i.e. mission, functions, image, and reputation) and assets, individuals, other organisations etc. on an ongoing basis | ||
Source | ENISA Risk Management Standards | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | NIST-SP-800-82 | Prefix | risk-owl |
---|---|---|---|
Label | NIST SP 800–82 | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#NIST-SP-800-82 https://w3id.org/dpv/risk#NIST-SP-800-82 | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | NIST SP 800-82 Rev. 2 (Stouffer, et al., 2015), entitled ‘Guide to industrial control systems (ISC) security’, is an Industrial Control Systems Security Guide | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | NominalGroupTechnique | Prefix | risk-owl |
---|---|---|---|
Label | Nominal Group Technique | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#NominalGroupTechnique https://w3id.org/dpv/risk#NominalGroupTechnique | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QualitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | Technique for eliciting views from a group of people where initial participation is as individuals with no interaction, then group discussion of ideas follows. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | O-RA | Prefix | risk-owl |
---|---|---|---|
Label | O-RA | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#O-RA https://w3id.org/dpv/risk#O-RA | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | The Open Group Standard for Risk Analysis (O-RA) provides a set of standards for various aspects of information security risk analysis that is based on the Open FAIR framework and can be applied to any risk scenario | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | OCTAVE | Prefix | risk-owl |
---|---|---|---|
Label | OCTAVE | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#OCTAVE https://w3id.org/dpv/risk#OCTAVE | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | Operationally Critical Threat, Asset, and Vulnerability Evaluation (OCTAVE) is a free of charge approach to evaluations of information security risk that is comprehensive, systematic, context-driven, and self-directed | ||
Source | ENISA Risk Management Standards | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | OCTAVE-ALLEGRO | Prefix | risk-owl |
---|---|---|---|
Label | OCTAVE ALLEGRO | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#OCTAVE-ALLEGRO https://w3id.org/dpv/risk#OCTAVE-ALLEGRO | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | OCTAVE Allegro is designed to allow broad assessment of an organisation’s operational risk environment, with the goal of producing robust results without the need for extensive knowledge of risk assessment | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | OCTAVE-FORTE | Prefix | risk-owl |
---|---|---|---|
Label | OCTAVE FORTE | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#OCTAVE-FORTE https://w3id.org/dpv/risk#OCTAVE-FORTE | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | The OCTAVE FORTE process model was developed to support organisations in evaluating their security risks. It applies Enterprise Risk Management (ERM) principles to bridge the gap between executives and practitioners acting as decision makers | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | OCTAVE-S | Prefix | risk-owl |
---|---|---|---|
Label | OCTAVE-S | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#OCTAVE-S https://w3id.org/dpv/risk#OCTAVE-S | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskManagement | ||
Sub-class of | risk-owl:RiskManagement | ||
Definition | The OCTAVE-S is based on the OCTAVE approach and is a self-directed approach, meaning that people from an organisation assume responsibility for setting the organisation’s security strategy | ||
Source | ENISA Compendium of Risk Management Frameworks with Potential Interoperability | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-methodology |
Term | OrganisationDisruption | Prefix | risk-owl |
---|---|---|---|
Label | Organisation Disruption | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#OrganisationDisruption https://w3id.org/dpv/risk#OrganisationDisruption | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | ParetoCharts | Prefix | risk-owl |
---|---|---|---|
Label | Pareto Charts | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ParetoCharts https://w3id.org/dpv/risk#ParetoCharts | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QuantitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | The Pareto principle (the 80–20 rule) states that, for many events, roughly 80 % of the effects come from 20 % of the causes. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | PersonalSafetyEndangerment | Prefix | risk-owl |
---|---|---|---|
Label | Personal Safety Endangerment | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#PersonalSafetyEndangerment https://w3id.org/dpv/risk#PersonalSafetyEndangerment | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Harm → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | PersonnelAbsence | Prefix | risk-owl |
---|---|---|---|
Label | Personnel Absence | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#PersonnelAbsence https://w3id.org/dpv/risk#PersonnelAbsence | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:NonMaterialDamage → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Threat Taxonomy 2016 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | PhishingScam | Prefix | risk-owl |
---|---|---|---|
Label | Phishing Scam | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#PhishingScam https://w3id.org/dpv/risk#PhishingScam | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Harm → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Definition | A type of social engineering attack involving deceptive messages intended to reveal sensitive information | ||
Source | ENISA Threat Landscape for Ransomware Attacks 2022 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | PhysicalAssault | Prefix | risk-owl |
---|---|---|---|
Label | Physical Assault | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#PhysicalAssault https://w3id.org/dpv/risk#PhysicalAssault | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Harm → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | PhysicalSpying | Prefix | risk-owl |
---|---|---|---|
Label | Physical Spying | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#PhysicalSpying https://w3id.org/dpv/risk#PhysicalSpying | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:NonMaterialDamage → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | PhysicalStalking | Prefix | risk-owl |
---|---|---|---|
Label | Physical Stalking | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#PhysicalStalking https://w3id.org/dpv/risk#PhysicalStalking | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:NonMaterialDamage → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | PIA | Prefix | risk-owl |
---|---|---|---|
Label | Privacy Impact Analysis (PIA) | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#PIA https://w3id.org/dpv/risk#PIA | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QualitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | Analyses how incidents and events could affect a person's privacy and identifies and quantifies the capabilities that would be needed to manage it. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | PreventExercisingOfRights | Prefix | risk-owl |
---|---|---|---|
Label | Prevent Exercising of Rights | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#PreventExercisingOfRights https://w3id.org/dpv/risk#PreventExercisingOfRights | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Harm → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Date Created | 2022-08-18 | ||
Contributors | Georg P. Krog, Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | PrivacyImpact | Prefix | risk-owl |
---|---|---|---|
Label | Privacy impact | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#PrivacyImpact https://w3id.org/dpv/risk#PrivacyImpact | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Methodology for Sectoral Cybersecurity Assessments | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | PsychologicalHarm | Prefix | risk-owl |
---|---|---|---|
Label | Psychological Harm | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#PsychologicalHarm https://w3id.org/dpv/risk#PsychologicalHarm | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Harm → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | PublicOrderBreach | Prefix | risk-owl |
---|---|---|---|
Label | Public Order Breach | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#PublicOrderBreach https://w3id.org/dpv/risk#PublicOrderBreach | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | QualitativeRiskAnalysis | Prefix | risk-owl |
---|---|---|---|
Label | Qualitative Risk Analysis | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#QualitativeRiskAnalysis https://w3id.org/dpv/risk#QualitativeRiskAnalysis | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | A risk analysis technique that uses qualitative methods | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | QuantitativeRiskAnalysis | Prefix | risk-owl |
---|---|---|---|
Label | Quantitative Risk Analysis | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#QuantitativeRiskAnalysis https://w3id.org/dpv/risk#QuantitativeRiskAnalysis | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | A risk analysis technique that uses quantitative methods | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | RansomwareAttack | Prefix | risk-owl |
---|---|---|---|
Label | RansomwareAttack | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#RansomwareAttack https://w3id.org/dpv/risk#RansomwareAttack | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:NonMaterialDamage → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Definition | Ransomware is a type of attack where threat actors take control of a target’s assets and demand a ransom in exchange for the return of the asset’s availability and confidentiality | ||
Source | ISO/IEC 27005:2018,ENISA Threat Landscape for Ransomware Attacks 2022 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | ReduceLikelihood | Prefix | risk-owl |
---|---|---|---|
Label | Reduce Likelihood | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ReduceLikelihood https://w3id.org/dpv/risk#ReduceLikelihood | ||
Type | rdfs:Class , owl:Class , dpv-owl:RiskMitigationMeasure | ||
Sub-class of | dpv-owl:RiskMitigationMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Domain of | dpv-owl:mitigatesRisk | ||
in Range of | dpv-owl:hasTechnicalOrganisationalMeasure, dpv-owl:isMitigatedByMeasure | ||
Definition | Risk Control that reduces the likelihood of an event | ||
Date Created | 2022-08-22 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-controls |
Term | ReduceSeverity | Prefix | risk-owl |
---|---|---|---|
Label | Reduce Severity | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ReduceSeverity https://w3id.org/dpv/risk#ReduceSeverity | ||
Type | rdfs:Class , owl:Class , dpv-owl:RiskMitigationMeasure | ||
Sub-class of | dpv-owl:RiskMitigationMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Domain of | dpv-owl:mitigatesRisk | ||
in Range of | dpv-owl:hasTechnicalOrganisationalMeasure, dpv-owl:isMitigatedByMeasure | ||
Definition | Risk Control that reduces the severity of an event | ||
Date Created | 2022-08-23 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-controls |
Term | RemoteSpying | Prefix | risk-owl |
---|---|---|---|
Label | Remote Spying | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#RemoteSpying https://w3id.org/dpv/risk#RemoteSpying | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:NonMaterialDamage → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | RemoveConsequence | Prefix | risk-owl |
---|---|---|---|
Label | Remove Consequence | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#RemoveConsequence https://w3id.org/dpv/risk#RemoveConsequence | ||
Type | rdfs:Class , owl:Class , dpv-owl:RiskMitigationMeasure | ||
Sub-class of | risk-owl:ControlConsequence → dpv-owl:RiskMitigationMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Domain of | dpv-owl:mitigatesRisk | ||
in Range of | dpv-owl:hasTechnicalOrganisationalMeasure, dpv-owl:isMitigatedByMeasure | ||
Definition | Risk Control that removes Consequence i.e. prevents it from materialising | ||
Date Created | 2022-08-27 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-controls |
Term | RemoveImpact | Prefix | risk-owl |
---|---|---|---|
Label | Remove Impact | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#RemoveImpact https://w3id.org/dpv/risk#RemoveImpact | ||
Type | rdfs:Class , owl:Class , dpv-owl:RiskMitigationMeasure | ||
Sub-class of | risk-owl:ControlImpact → risk-owl:ControlConsequence → dpv-owl:RiskMitigationMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Domain of | dpv-owl:mitigatesRisk | ||
in Range of | dpv-owl:hasTechnicalOrganisationalMeasure, dpv-owl:isMitigatedByMeasure | ||
Definition | Risk Control that removes Impact i.e. prevents it from materialising | ||
Date Created | 2022-08-28 | ||
Date Modified | 2023-07-31 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-controls |
Term | RemoveSource | Prefix | risk-owl |
---|---|---|---|
Label | Remove Source | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#RemoveSource https://w3id.org/dpv/risk#RemoveSource | ||
Type | rdfs:Class , owl:Class , dpv-owl:RiskMitigationMeasure | ||
Sub-class of | risk-owl:ControlRiskSource → dpv-owl:RiskMitigationMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Domain of | dpv-owl:mitigatesRisk | ||
in Range of | dpv-owl:hasTechnicalOrganisationalMeasure, dpv-owl:isMitigatedByMeasure | ||
Definition | Risk Control that removes the risk source | ||
Date Created | 2022-08-20 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-controls |
Term | ReplacementCosts | Prefix | risk-owl |
---|---|---|---|
Label | Replacement Costs | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ReplacementCosts https://w3id.org/dpv/risk#ReplacementCosts | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | ReputationTrustImpact | Prefix | risk-owl |
---|---|---|---|
Label | Reputation and trust impact | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ReputationTrustImpact https://w3id.org/dpv/risk#ReputationTrustImpact | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Methodology for Sectoral Cybersecurity Assessments | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | RetrievalDeletedData | Prefix | risk-owl |
---|---|---|---|
Label | Retrieval of Deleted Data | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#RetrievalDeletedData https://w3id.org/dpv/risk#RetrievalDeletedData | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | RetrievalDiscardedEquipment | Prefix | risk-owl |
---|---|---|---|
Label | Retrieval of Discarded Equipment | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#RetrievalDiscardedEquipment https://w3id.org/dpv/risk#RetrievalDiscardedEquipment | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | RiskAnalysis | Prefix | risk-owl |
---|---|---|---|
Label | RiskAnalysis | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#RiskAnalysis https://w3id.org/dpv/risk#RiskAnalysis | ||
Type | rdfs:Class , owl:Class | ||
Sub-class of | dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | A technique or method used to analyse and identify risk levels, sources, likelihoods, severities, and other necessary information required to conduct risk management procedures | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | RiskIndices | Prefix | risk-owl |
---|---|---|---|
Label | Risk Indices | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#RiskIndices https://w3id.org/dpv/risk#RiskIndices | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QuantitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | Rates the significance of risks based on ratings applied to factors which are believed to influence the magnitude of the risk. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | RiskMatrix3x3 | Prefix | risk-owl |
---|---|---|---|
Label | Risk Matrix 3x3 | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#RiskMatrix3x3 https://w3id.org/dpv/risk#RiskMatrix3x3 | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:RiskMatrix → risk-owl:QualitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
Sub-class of | risk-owl:RiskMatrix → risk-owl:QuantitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | A Risk Matrix with 3 Likelihood, 3 Severity, and 3 Risk Level types | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-matrix |
Term | RiskMatrix5x5 | Prefix | risk-owl |
---|---|---|---|
Label | Risk Matrix 5x5 | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#RiskMatrix5x5 https://w3id.org/dpv/risk#RiskMatrix5x5 | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:RiskMatrix → risk-owl:QualitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
Sub-class of | risk-owl:RiskMatrix → risk-owl:QuantitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | A Risk Matrix with 5 Likelihood, 5 Severity, and 5 Risk Level types | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-matrix |
Term | RiskMatrix7x7 | Prefix | risk-owl |
---|---|---|---|
Label | Risk Matrix 7x7 | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#RiskMatrix7x7 https://w3id.org/dpv/risk#RiskMatrix7x7 | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:RiskMatrix → risk-owl:QualitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
Sub-class of | risk-owl:RiskMatrix → risk-owl:QuantitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | A Risk Matrix with 7 Likelihood, 7 Severity, and 7 Risk Level types | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-matrix |
Term | RiskRegisters | Prefix | risk-owl |
---|---|---|---|
Label | Risk Registers | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#RiskRegisters https://w3id.org/dpv/risk#RiskRegisters | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QualitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | A means of recording information about risks and tracking actions. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | Sabotage | Prefix | risk-owl |
---|---|---|---|
Label | Sabotage | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#Sabotage https://w3id.org/dpv/risk#Sabotage | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Harm → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | Scam | Prefix | risk-owl |
---|---|---|---|
Label | Scam | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#Scam https://w3id.org/dpv/risk#Scam | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Harm → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | ScenarioAnalysis | Prefix | risk-owl |
---|---|---|---|
Label | Scenario Analysis | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ScenarioAnalysis https://w3id.org/dpv/risk#ScenarioAnalysis | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QualitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | Identifies possible future scenarios through imagination, extrapolation from the present or modelling. Risk is then considered for each of these scenarios. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | SCurves | Prefix | risk-owl |
---|---|---|---|
Label | S-curves | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#SCurves https://w3id.org/dpv/risk#SCurves | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QuantitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | A means of displaying the relationship between consequences and their likelihood plotted as a cumulative distribution function (S-curve). | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | SecurityBreach | Prefix | risk-owl |
---|---|---|---|
Label | Security Breach | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#SecurityBreach https://w3id.org/dpv/risk#SecurityBreach | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | ServiceInterruption | Prefix | risk-owl |
---|---|---|---|
Label | Service Interruption | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ServiceInterruption https://w3id.org/dpv/risk#ServiceInterruption | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | SexualViolence | Prefix | risk-owl |
---|---|---|---|
Label | Sexual Violence | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#SexualViolence https://w3id.org/dpv/risk#SexualViolence | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Harm → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | SFAIRP | Prefix | risk-owl |
---|---|---|---|
Label | SFAIRP | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#SFAIRP https://w3id.org/dpv/risk#SFAIRP | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QualitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
Sub-class of | risk-owl:QuantitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | So far as is Resonably Practiceable (ALARP) - A criteria for deciding significance of risk and means of evaluating tolerability of risk | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | SocialDisadvantage | Prefix | risk-owl |
---|---|---|---|
Label | Social Disadvantage | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#SocialDisadvantage https://w3id.org/dpv/risk#SocialDisadvantage | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Date Created | 2022-08-19 | ||
Contributors | Georg P. Krog | ||
Documented in | Risk Risk-consequences |
Term | Spam | Prefix | risk-owl |
---|---|---|---|
Label | Spam | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#Spam https://w3id.org/dpv/risk#Spam | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Harm → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | Spoofing | Prefix | risk-owl |
---|---|---|---|
Label | Spoofing | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#Spoofing https://w3id.org/dpv/risk#Spoofing | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Harm → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | Spying | Prefix | risk-owl |
---|---|---|---|
Label | Spying | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#Spying https://w3id.org/dpv/risk#Spying | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:NonMaterialDamage → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | Stalking | Prefix | risk-owl |
---|---|---|---|
Label | Stalking | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#Stalking https://w3id.org/dpv/risk#Stalking | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:NonMaterialDamage → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | Surveys | Prefix | risk-owl |
---|---|---|---|
Label | Surveys | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#Surveys https://w3id.org/dpv/risk#Surveys | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QualitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | Paper- or computer-based questionnaires to elicit views. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | SWIFT | Prefix | risk-owl |
---|---|---|---|
Label | Structured "What If?" (SWIFT) | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#SWIFT https://w3id.org/dpv/risk#SWIFT | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QualitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | A simpler form of HAZOP with prompts of "what if" to identify deviations from the expected. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | SystemFailure | Prefix | risk-owl |
---|---|---|---|
Label | System Failure | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#SystemFailure https://w3id.org/dpv/risk#SystemFailure | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Threat Landscape for Ransomware Attacks 2022 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | SystemIntrusion | Prefix | risk-owl |
---|---|---|---|
Label | System Intrusion | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#SystemIntrusion https://w3id.org/dpv/risk#SystemIntrusion | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | SystemMalfunction | Prefix | risk-owl |
---|---|---|---|
Label | System Malfunction | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#SystemMalfunction https://w3id.org/dpv/risk#SystemMalfunction | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | Taxonomies | Prefix | risk-owl |
---|---|---|---|
Label | Taxonomies | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#Taxonomies https://w3id.org/dpv/risk#Taxonomies | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QualitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | A taxonomy based on experience or on concepts and models that can be used to help identify risks or controls. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | Terrorism | Prefix | risk-owl |
---|---|---|---|
Label | Terrorism | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#Terrorism https://w3id.org/dpv/risk#Terrorism | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Harm → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | Theft | Prefix | risk-owl |
---|---|---|---|
Label | Theft | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#Theft https://w3id.org/dpv/risk#Theft | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:MaterialDamage → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | TheftEquipment | Prefix | risk-owl |
---|---|---|---|
Label | Theft of Equipment | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#TheftEquipment https://w3id.org/dpv/risk#TheftEquipment | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:MaterialDamage → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | TheftMedia | Prefix | risk-owl |
---|---|---|---|
Label | Theft of Media | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#TheftMedia https://w3id.org/dpv/risk#TheftMedia | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:MaterialDamage → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | ThirdPartyOperationDisruption | Prefix | risk-owl |
---|---|---|---|
Label | Third Party Operation Disruption | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ThirdPartyOperationDisruption https://w3id.org/dpv/risk#ThirdPartyOperationDisruption | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | Toxicological | Prefix | risk-owl |
---|---|---|---|
Label | Toxicological Risk Assessment | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#Toxicological https://w3id.org/dpv/risk#Toxicological | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QuantitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | A series of steps taken to obtain a measure for the risk to humans or ecological systems due to exposure to chemicals. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | UnauthorisedAccesstoPremises | Prefix | risk-owl |
---|---|---|---|
Label | Unauthorised Access to Premises | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#UnauthorisedAccesstoPremises https://w3id.org/dpv/risk#UnauthorisedAccesstoPremises | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | UnauthorisedCodeAccess | Prefix | risk-owl |
---|---|---|---|
Label | Unauthorised Code Access | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#UnauthorisedCodeAccess https://w3id.org/dpv/risk#UnauthorisedCodeAccess | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Methodology for Sectoral Cybersecurity Assessments | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | UnauthorisedCodeDisclosure | Prefix | risk-owl |
---|---|---|---|
Label | Unauthorised Code Disclosure | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#UnauthorisedCodeDisclosure https://w3id.org/dpv/risk#UnauthorisedCodeDisclosure | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Methodology for Sectoral Cybersecurity Assessments | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | UnauthorisedCodeModification | Prefix | risk-owl |
---|---|---|---|
Label | Unauthorised Code Modification | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#UnauthorisedCodeModification https://w3id.org/dpv/risk#UnauthorisedCodeModification | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Methodology for Sectoral Cybersecurity Assessments | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | UnauthorisedDataAccess | Prefix | risk-owl |
---|---|---|---|
Label | Unauthorised Data Access | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#UnauthorisedDataAccess https://w3id.org/dpv/risk#UnauthorisedDataAccess | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | UnauthorisedDataDisclosure | Prefix | risk-owl |
---|---|---|---|
Label | Unauthorised Data Disclosure | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#UnauthorisedDataDisclosure https://w3id.org/dpv/risk#UnauthorisedDataDisclosure | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | UnauthorisedDataModification | Prefix | risk-owl |
---|---|---|---|
Label | Unauthorised Data Modification | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#UnauthorisedDataModification https://w3id.org/dpv/risk#UnauthorisedDataModification | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:NonMaterialDamage → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | UnauthorisedImpersonation | Prefix | risk-owl |
---|---|---|---|
Label | Unauthorised Impersonation | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#UnauthorisedImpersonation https://w3id.org/dpv/risk#UnauthorisedImpersonation | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:NonMaterialDamage → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | UnauthorisedInformationDisclosure | Prefix | risk-owl |
---|---|---|---|
Label | Unauthorised Information Disclosure | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#UnauthorisedInformationDisclosure https://w3id.org/dpv/risk#UnauthorisedInformationDisclosure | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | UnauthorisedReIdentification | Prefix | risk-owl |
---|---|---|---|
Label | Unauthorised Re-Identification | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#UnauthorisedReIdentification https://w3id.org/dpv/risk#UnauthorisedReIdentification | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence | ||
Date Created | 2022-08-19 | ||
Contributors | Georg P. Krog | ||
Documented in | Risk Risk-consequences |
Term | UnauthorisedResourceUse | Prefix | risk-owl |
---|---|---|---|
Label | Unauthorised Resource Use | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#UnauthorisedResourceUse https://w3id.org/dpv/risk#UnauthorisedResourceUse | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | UnauthorisedSystemAccess | Prefix | risk-owl |
---|---|---|---|
Label | Unauthorised System Access | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#UnauthorisedSystemAccess https://w3id.org/dpv/risk#UnauthorisedSystemAccess | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | UnauthorisedSystemModification | Prefix | risk-owl |
---|---|---|---|
Label | Unauthorised System Modification | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#UnauthorisedSystemModification https://w3id.org/dpv/risk#UnauthorisedSystemModification | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Methodology for Sectoral Cybersecurity Assessments | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | UnknownVulnerabilityExploited | Prefix | risk-owl |
---|---|---|---|
Label | Unknown Vulnerability Exploited | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#UnknownVulnerabilityExploited https://w3id.org/dpv/risk#UnknownVulnerabilityExploited | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | UnwantedCodeDeletion | Prefix | risk-owl |
---|---|---|---|
Label | Unwanted Code Deletion | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#UnwantedCodeDeletion https://w3id.org/dpv/risk#UnwantedCodeDeletion | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Methodology for Sectoral Cybersecurity Assessments | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | UnwantedDataDeletion | Prefix | risk-owl |
---|---|---|---|
Label | Unwanted Data Deletion | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#UnwantedDataDeletion https://w3id.org/dpv/risk#UnwantedDataDeletion | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | UnwantedDisclosureData | Prefix | risk-owl |
---|---|---|---|
Label | Unwanted Disclosure of Data | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#UnwantedDisclosureData https://w3id.org/dpv/risk#UnwantedDisclosureData | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | Vandalism | Prefix | risk-owl |
---|---|---|---|
Label | Vandalism | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#Vandalism https://w3id.org/dpv/risk#Vandalism | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Threat Taxonomy 2016 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | VaR | Prefix | risk-owl |
---|---|---|---|
Label | Value At Risk (VaR) | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#VaR https://w3id.org/dpv/risk#VaR | ||
Type | rdfs:Class , owl:Class , risk-owl:RiskAnalysis | ||
Sub-class of | risk-owl:QuantitativeRiskAnalysis → risk-owl:RiskAnalysis → dpv-owl:RiskAssessment → dpv-owl:Assessment → dpv-owl:OrganisationalMeasure → dpv-owl:TechnicalOrganisationalMeasure | ||
in Range of | dpv-owl:hasAssessment, dpv-owl:hasOrganisationalMeasure, dpv-owl:hasRiskAssessment, dpv-owl:hasTechnicalOrganisationalMeasure | ||
Definition | Financial measure of risk that uses an assumed probability distribution of losses in a stable market condition to calculate the value of a loss that might occur with a specified probability within a defined time span. | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-assessment |
Term | VeryHighLikelihood | Prefix | risk-owl |
---|---|---|---|
Label | Very High Likelihood | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#VeryHighLikelihood https://w3id.org/dpv/risk#VeryHighLikelihood | ||
Type | rdfs:Class , owl:Class , dpv-owl:Likelihood | ||
Sub-class of | risk-owl:5LikelihoodLevels → dpv-owl:Likelihood | ||
Sub-class of | risk-owl:7LikelihoodLevels → dpv-owl:Likelihood | ||
in Range of | dpv-owl:hasLikelihood | ||
Definition | Level where Likelihood is Very High | ||
Usage Note | The suggested quantitative value for this concept is 0.9 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-levels |
Term | VeryHighRisk | Prefix | risk-owl |
---|---|---|---|
Label | Very High Risk | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#VeryHighRisk https://w3id.org/dpv/risk#VeryHighRisk | ||
Type | rdfs:Class , owl:Class , dpv-owl:RiskLevel | ||
Sub-class of | risk-owl:5RiskLevels → dpv-owl:RiskLevel | ||
Sub-class of | risk-owl:7RiskLevels → dpv-owl:RiskLevel | ||
in Range of | dpv-owl:hasRiskLevel | ||
Definition | Level where Risk is Very High | ||
Usage Note | The suggested quantitative value for this concept is 0.9 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-levels |
Term | VeryHighSeverity | Prefix | risk-owl |
---|---|---|---|
Label | Very High Severity | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#VeryHighSeverity https://w3id.org/dpv/risk#VeryHighSeverity | ||
Type | rdfs:Class , owl:Class , dpv-owl:Severity | ||
Sub-class of | risk-owl:5SeverityLevels → dpv-owl:Severity | ||
Sub-class of | risk-owl:7SeverityLevels → dpv-owl:Severity | ||
in Range of | dpv-owl:hasSeverity | ||
Definition | Level where Severity is Very High | ||
Usage Note | The suggested quantitative value for this concept is 0.9 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-levels |
Term | VeryLowLikelihood | Prefix | risk-owl |
---|---|---|---|
Label | Very Low Likelihood | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#VeryLowLikelihood https://w3id.org/dpv/risk#VeryLowLikelihood | ||
Type | rdfs:Class , owl:Class , dpv-owl:Likelihood | ||
Sub-class of | risk-owl:5LikelihoodLevels → dpv-owl:Likelihood | ||
Sub-class of | risk-owl:7LikelihoodLevels → dpv-owl:Likelihood | ||
in Range of | dpv-owl:hasLikelihood | ||
Definition | Level where Likelihood is Very Low | ||
Usage Note | The suggested quantitative value for this concept is 0.1 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-levels |
Term | VeryLowRisk | Prefix | risk-owl |
---|---|---|---|
Label | Very Low Risk | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#VeryLowRisk https://w3id.org/dpv/risk#VeryLowRisk | ||
Type | rdfs:Class , owl:Class , dpv-owl:RiskLevel | ||
Sub-class of | risk-owl:5RiskLevels → dpv-owl:RiskLevel | ||
Sub-class of | risk-owl:7RiskLevels → dpv-owl:RiskLevel | ||
in Range of | dpv-owl:hasRiskLevel | ||
Definition | Level where Risk is Very Low | ||
Usage Note | The suggested quantitative value for this concept is 0.1 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-levels |
Term | VeryLowSeverity | Prefix | risk-owl |
---|---|---|---|
Label | Very Low Severity | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#VeryLowSeverity https://w3id.org/dpv/risk#VeryLowSeverity | ||
Type | rdfs:Class , owl:Class , dpv-owl:Severity | ||
Sub-class of | risk-owl:5SeverityLevels → dpv-owl:Severity | ||
Sub-class of | risk-owl:7SeverityLevels → dpv-owl:Severity | ||
in Range of | dpv-owl:hasSeverity | ||
Definition | Level where Severity is Very Low | ||
Usage Note | The suggested quantitative value for this concept is 0.1 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-levels |
Term | ViolationCodeConduct | Prefix | risk-owl |
---|---|---|---|
Label | Violation of Code of Conduct | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ViolationCodeConduct https://w3id.org/dpv/risk#ViolationCodeConduct | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | ViolationContractualObligations | Prefix | risk-owl |
---|---|---|---|
Label | Violation of Contractual Obligations | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ViolationContractualObligations https://w3id.org/dpv/risk#ViolationContractualObligations | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | ViolationEthicalCode | Prefix | risk-owl |
---|---|---|---|
Label | Violation of Ethical Code | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ViolationEthicalCode https://w3id.org/dpv/risk#ViolationEthicalCode | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | ViolationOfRights | Prefix | risk-owl |
---|---|---|---|
Label | Violation of Rights | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ViolationOfRights https://w3id.org/dpv/risk#ViolationOfRights | ||
Type | rdfs:Class , owl:Class , dpv-owl:Impact | ||
Sub-class of | dpv-owl:Harm → dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasImpactOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Date Created | 2022-08-18 | ||
Contributors | Georg P. Krog, Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | ViolationRegulatoryObligations | Prefix | risk-owl |
---|---|---|---|
Label | Violation of Regulatory Obligations | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ViolationRegulatoryObligations https://w3id.org/dpv/risk#ViolationRegulatoryObligations | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | ViolationStatutoryObligations | Prefix | risk-owl |
---|---|---|---|
Label | Violation of Statutory Obligations | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#ViolationStatutoryObligations https://w3id.org/dpv/risk#ViolationStatutoryObligations | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Damage → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | VulnerabilityCreated | Prefix | risk-owl |
---|---|---|---|
Label | Vulnerability Created | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#VulnerabilityCreated https://w3id.org/dpv/risk#VulnerabilityCreated | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
Term | VulnerabilityExploited | Prefix | risk-owl |
---|---|---|---|
Label | Vulnerability Exploited | ||
IRI (owl) IRI (canonical) |
https://w3id.org/dpv/risk/owl/#VulnerabilityExploited https://w3id.org/dpv/risk#VulnerabilityExploited | ||
Type | rdfs:Class , owl:Class , dpv-owl:Consequence | ||
Sub-class of | dpv-owl:Detriment → dpv-owl:Impact → dpv-owl:Consequence | ||
in Domain of | dpv-owl:hasConsequenceOn | ||
in Range of | dpv-owl:hasConsequence, dpv-owl:hasImpact | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
Documented in | Risk Risk-consequences |
The following external concepts are re-used within DPV: